LIST OF Under Progress MACRO WORKS

  Workcode Taluka Type Subtype Category Work Name Agency Plan Approved Date Allocation ADM Approved Date ADM Amount Work Order Amt Exp Stages of Work Status Updated On
 
Sl.NoWorkcodeTal_NameSub TypeSectorCategoryWORK NAMEAGENCY NAMEPlan App DATEAllocationAdm APP DateADM AmtWO AmtEXPStages of workStatus Type NameLast Modified
1 KLB161113363AfzalpurInstitutionalEducationGeneralM.Y Ghorpade G. P Building NandargaPRED07/11/2016 50.00 20/03/201750.0047.070.00Work Order Issued on 06.10.2017 Mark out to be givenUnder Progress10/26/2017 11:18:50 AM
2 KLB161113373AfzalpurInstitutionalEducationGeneralConstn of 06 rooms and dismantling of 4 room of HPS at Gabbur (B) village in Afzalpur talukaPRED03/01/2017 32.35 03/01/201732.3527.5110.12Firstfloor Roof Completed GF Plastering Under Progress Under Progress12/5/2017 5:01:26 PM
3 KLB161113374AfzalpurInstitutionalEducationGeneralConstn of GHPS four room building at Gour (K) village in Afzalpur talukaPRED03/01/2017 23.02 03/01/201723.0220.7811.87GF Complteted FF Roof Level Under Progress12/5/2017 5:01:47 PM
4 KLB161113375AfzalpurInstitutionalEducationGeneralConstn of GHPS two room building at Saganoor village in Afzalpur talukaPRED03/01/2017 12.20 03/01/201712.2011.294.73Roof Level Under Progress12/5/2017 5:02:13 PM
5 KLB161113376AfzalpurInstitutionalEducationGeneralConstn of GHPS two room building at Jewargi village in Afzalpur talukaPRED03/01/2017 12.20 03/01/201712.2011.743.04Lintel LevelUnder Progress12/5/2017 5:02:33 PM
6 KLB161113377AfzalpurInstitutionalEducationGeneralConstn of GHPS four room building at Nandargi village in Afzalpur talukaPRED03/01/2017 23.02 03/01/201723.0220.584.37Ground Floor Roof Centring Under Progress12/5/2017 5:03:14 PM
7 KLB161113378AfzalpurInstitutionalEducationGeneralConstn of GHPS four room building at Bandarwad village in Afzalpur talukaPRED03/01/2017 23.02 03/01/201723.0219.722.81GF Roof Level Under Progress12/5/2017 5:03:32 PM
8 KLB161113379AfzalpurInstitutionalEducationGeneralConstn of GHPS four room building at Bhosga village in Afzalpur talukaPRED03/01/2017 23.02 03/01/201723.0219.720.00Basement Level And Columns Rised up to Basement Under Progress12/5/2017 5:03:53 PM
9 KLB161113380AfzalpurInstitutionalEducationGeneralConstn of GHPS two room building at Huvinhalli village in Afzalpur talukaPRED03/01/2017 12.20 03/01/201712.2011.285.48Plastering work Completed Flooring Under Progress Under Progress12/5/2017 5:04:19 PM
10 KLB161113381AfzalpurInstitutionalEducationGeneralConstn of GHPS two room building at Choudapur village in Afzalpur talukaPRED03/01/2017 12.20 03/01/201712.2011.155.49Roof Slab Laid Under Progress12/5/2017 5:04:38 PM
11 KLB161113382AfzalpurInstitutionalEducationGeneralConstn of GHPS four room building at Chinmalli village in Afzalpur talukaPRED03/01/2017 23.02 03/01/201723.0219.727.57RGF Roof Laid FF Roof Level Under Progress12/5/2017 5:04:59 PM
12 KLB161123140AfzalpurInfrastructureRoads & BridgesGeneralConstn of CC road and reinforced CC Drain at Mashyal village in Afzlapur Taluka.KRIDL-226/08/2016 100.00 26/08/2016100.000.0042.00CC Drain & road work U/pUnder Progress10/24/2017 12:53:48 PM
13 KLB162113167AlandInstitutionalEducationGeneralConstruction of Two & One Room School Building at Kudki Village in Aland Tq.KRIDL-227/03/2017 19.71 27/03/201719.710.0011.50Two Room Finishing Work U/P & One Room BBM work U/P Under Progress12/8/2017 5:42:37 PM
14 KLB162113168AlandInstitutionalEducationGeneralConstruction of Two room School Building (First Floor) and Solar System at Kudi Village in Aland TalukaKRIDL-227/03/2017 11.50 27/03/201711.500.004.00Coloum up Lintel Level Under Progress11/19/2017 1:25:34 PM
15 KLB162113177AlandInstitutionalEducationGeneralProposed Estimate for Repairs of 9 Class rooms and compound wall repair at Narona in Aland TalukaNK03/24/2017 13.73 16/08/201613.730.003.483 rooms completed & work u/pUnder Progress10/11/2017 6:03:35 PM
16 KLB162113364AlandInstitutionalEducationGeneralM.Y Ghorpade G. P Building DannurPRED07/11/2016 50.00 20/03/201750.0049.040.00wORK oRDER iSSUED TO cONTRACTOR wORK TO BE STARTUnder Progress10/26/2017 11:19:10 AM
17 KLB162113383AlandInstitutionalEducationGeneralConstruction of two room school building (first floor) and solar system at Kudki village in Aland talukaCEO12/02/2016 11.50 12/02/201611.500.000.00adm given and amount releasedUnder Progress 
18 KLB162113385AlandInstitutionalEducationGeneralConstn of Library building at Nimbarga villagePWD KLB02/01/2017 15.57 28/03/201715.570.000.00Agency changed from NK to PWD vide order no 1945 dated 24-10-2017Under Progress11/19/2017 4:08:06 PM
19 KLB162123221AlandInfrastructureRoads & BridgesGeneralConstruction of road from Muddadga village to Muradi village, Aland Tq., Dist. KalaburagiPRED28/02/2017 161.90 15/03/2017161.90145.1146.31 Sub grede Work under Progress Under Progress11/13/2017 12:46:48 PM
20 KLB162313496AlandInstitutionalEducationGeneralConstn. of Four Class rooms Building to Govt. HS at Duttargaoan village in Aland Tq.KRIDL-226/11/2016 25.00 05/02/201735.200.0020.00Roof LevelUnder Progress11/19/2017 1:24:27 PM
21 KLB163113141ChincholiInstitutionalEducationGeneralConstruction of Chandapur P.U. College at Chincholi Town.KRIDL-226/11/2016 131.50 08/12/2016140.700.0098.00Finishing Work U/P Under Progress12/8/2017 5:47:37 PM
22 KLB163113142ChincholiInstitutionalEducationGeneralConstruction of Four Class Rooms Building to Govt. LPS at Indrampad Hosalli village Chincholi Tq. KRIDL-225/10/2016 30.00 30/12/201630.000.0010.00ಬೇಸಕೊಟ್ ಪೂರ್ಣಗೊಂಡಿದೆ.Under Progress11/19/2017 1:52:15 PM
23 KLB163113143ChincholiInstitutionalEducationGeneralConstruction of 2 ladies toilet block at Indrampad Hosalli village Chincholi Tq.KRIDL-225/10/2016 20.00 30/12/201620.000.000.50Ground Floor Work Completed After Work Started Under Progress12/8/2017 5:22:58 PM
24 KLB163113367ChincholiInstitutionalEducationGeneralM.Y Ghorpade G. P Building GaragpalliPRED07/11/2016 50.00 20/03/201750.0048.980.00mARK OUT gIVEN wORK uNDER pROGRESSUnder Progress11/9/2017 5:44:38 PM
25 KLB163113368ChincholiInstitutionalEducationGeneralM.Y Ghorpade G. P Building GharampalliPRED07/11/2016 50.00 20/03/201750.0048.980.00Work Order Issued Mark out Given- Work Under ProgressUnder Progress10/26/2017 11:17:46 AM
26 KLB163123174ChincholiInfrastructureIrrigationGeneralProviding Barrage Gates to Existing Garagapalli – Ghaktampalli Barrage- Cum- Bridge in Chincholli Tq.MI30/12/2016 44.00 30/12/201644.0035.3626.97Work nearing completion Under Progress11/25/2017 4:55:36 PM
27 KLB163123225ChincholiInfrastructureRoads & BridgesGeneralImprovement of road from Goudanahalli village to Chimmanchod Chimmaidlai Cross, Length - 1.470 km Chincholi TalukaPRED20/12/2016 64.10 03/02/201761.2059.1433.76Grade III Metalling and CD Completed BT to be DoneUnder Progress12/5/2017 11:09:36 AM
28 KLB163123276ChincholiInfrastructureRoads & BridgesGeneralImprovement of road from Chintapalli to Ramlingeshwar Temple Length 0.70 Km Chincholi Tq.PWD SEDAM07/07/2017 4.87 07/07/20174.870.000.00Work under progressUnder Progress10/7/2017 6:51:14 PM
29 KLB163123277ChincholiInfrastructureRoads & BridgesGeneralImprovement of road from Benakanhalli to Bhutpur cross via Chintapalli in Chincholi taluka length 5.00 kmPWD SEDAM27/10/2016 224.80 27/01/2017224.800.000.00Under ProgressUnder Progress8/8/2017 12:25:01 PM
30 KLB163123279ChincholiInfrastructureRoads & BridgesGeneralImprovement of road from Penchanpalli to Kupnoor village in Chincholi talukaPWD SEDAM27/10/2016 68.70 09/12/201668.7057.1431.92under progressUnder Progress10/4/2017 4:55:14 PM
31 KLB163123280ChincholiInfrastructureRoads & BridgesGeneralImprovement of road from Garagpalli to Anwar via Fardar Motakpalli in Chincholi taluka, Length 5.24kmPWD SEDAM27/10/2016 262.60 27/01/2017262.60205.76118.02under progressUnder Progress9/4/2017 5:20:31 PM
32 KLB163123281ChincholiInfrastructureRoads & BridgesGeneralConstruction of road from Halkoda village to Habal - T, Length 4.617 km in Chincholi Taluka, Kalaburagi Dist.PWD SEDAM07/11/2016 272.60 27/01/2017272.60224.590.00Earth work formation in progressUnder Progress9/23/2017 12:05:41 PM
33 KLB163313490ChincholiInstitutionalEducationGeneralConstruction of 04 Class room Building for Govt. Primary school at Bhaktampalli village in Chincholi TalukaKRIDL-207/10/2016 25.00 24/11/201625.000.001.00Foundation U/PUnder Progress10/27/2017 3:45:21 PM
34 KLB163313492ChincholiInstitutionalEducationSCPಗಡಿಕೇಶ್ವರ ಗ್ರ್ರಾಮದ ಎಸ್.ಸಿ. ಓಣಿಯಲ್ಲಿಯ ಸರ್ಕಾರಿ ಪ್ರಾಥಮಿಕ ಶಾಲೆಗೆ 01 ಕೋಣೆನಿರ್ಮಾಣKRIDL-218/10/2016 7.00 09/12/20167.000.005.00roof Laid.Under Progress11/19/2017 1:51:03 PM
35 KLB163313493ChincholiInstitutionalEducationGeneralಗಡಿಕೇಶ್ವರ ಗ್ರ್ರಾಮದಸರ್ಕಾರಿ ಹಿರಿಯ ಪ್ರಾಥಮಿಕ ಶಾಲೆಯ ಸದ್ಯಕ್ಕೆ ಇರುವ 05 ಹಳೆಯ ಕಟ್ಟಡಗಳನ್ನು ತೆರವುಗೊಳಿಸಿ 05 ಹೊಸ ಕೋಣೆನಿರ್ಮಾಣKRIDL-218/10/2016 35.00 09/12/201635.000.006.00Basement Completed Under Progress12/8/2017 5:23:38 PM
36 KLB163313494ChincholiInstitutionalEducationGeneralಸರ್ಕಾರಿ ಕನ್ಯಾ ಪ್ರೌಢ ಶಾಲೆ ಮಿನಿ ವಿಧಾನಸೌಧದ ಹಿಂದುಗಡೆ ಸೇಡಂ 04 ಕೋಣೆ ಮತ್ತು ಶೌಚಾಲಯನಿರ್ಮಾಣ KRIDL-227/10/2016 32.45 18/01/201732.450.0025.00Finishing Work U/PUnder Progress12/8/2017 5:25:23 PM
37 KLB163323460ChincholiInfrastructureRoads & BridgesGeneralಚಿಂಚೋಳ್ಳಿ ತಾಲೂಕಿನ ಚಿಂತಪಳ್ಳಿ ಗ್ರ್ರಾಮದಲ್ಲಿ ಸಿಸಿ ರಸ್ತೆನಿರ್ಮಾಣ ಮಾಡುವುದು.KRIDL-216/07/2016 10.00 05/12/201610.000.003.00CC Road U/P.Under Progress10/24/2017 1:09:45 PM
38 KLB163323461ChincholiInfrastructureRoads & BridgesGeneralಚಿಂಚೋಳಿ ತಾಲೂಕಿನ ಗಡಿಕೇಶ್ವರ ಗ್ರ್ರಾಮದಲ್ಲಿ ಸಿಸಿ ರಸ್ತೆನಿರ್ಮಾಣ ಮಾಡುವುದು.KRIDL-216/07/2016 20.00 05/12/201620.000.0015.00C.C. Road U/P.Under Progress11/19/2017 1:30:27 PM
39 KLB163323462ChincholiInfrastructureRoads & BridgesGeneralConstn of cause way on Jattur Hanadi at Shirolli village and GP in Chincholi talukaPRED01/09/2016 10.50 14/12/20169.028.133.67CD works completed,Revetment under Progress Under Progress12/5/2017 11:06:14 AM
40 KLB163323463ChincholiInfrastructureRoads & BridgesGeneralFormation of road on Rudnoor Hanadi at Shirolli village and GP in Chincholi taluka PRED01/09/2016 14.50 14/12/201614.0311.952.66GR II metalling under ProgresUnder Progress12/5/2017 11:07:56 AM
41 KLB163423432ChincholiInfrastructureRoads & BridgesGeneralImprovements of road from Allapur to Kodli Village in Chincholi TalukaPRED14/12/2016 100.00 01/04/2017100.0086.960.00 Work under Progress Under Progress12/5/2017 11:09:14 AM
42 KLB164113365ChittapurInstitutionalEducationGeneralM.Y Ghorpade G. P Building BadesurPRED07/11/2016 50.00 02/03/201750.0048.980.00Work Order Issued Work Under ProgressUnder Progress10/26/2017 11:15:48 AM
43 KLB164113366ChittapurInstitutionalEducationGeneralM.Y Ghorpade G. P Building MogalnagaonPRED07/11/2016 50.00 02/03/201750.0048.030.00Work Order Issued Work Under ProgressUnder Progress10/26/2017 11:16:21 AM
44 KLB164113405ChittapurInstitutionalEducationGeneralDetailed Estimate for proposed construction of Multi Purpose Hall at Jawahar Navodaya School, Korwar in Dist. Kalaburagi NK07/11/2016 50.00 01/09/201750.000.000.00Work u/p Under Progress10/9/2017 4:31:13 PM
45 KLB164123228ChittapurInfrastructureRoads & BridgesGeneralFormation of Road and Cross Drain from Satnoor Village Main Road to Higher Primary School, Length of 0.185 km Chittapur Tq. Kalaburagi Dist.PRED05/12/2016 14.00 14/02/201714.0013.510.00Work under Progress Under Progress12/5/2017 11:10:50 AM
46 KLB164123229ChittapurInfrastructureRoads & BridgesGeneralFormation of CC roads and Drain from Chowdamma Drinking Wells to Main Road, Sathnoor Village, Chittapur TalukaPRED05/12/2016 8.40 09/02/20178.307.890.00Work under ProgresUnder Progress12/5/2017 11:10:15 AM
47 KLB164423429ChittapurInfrastructureRoads & BridgesGeneralProviding CC Road and Drain from Panduranga Temple to Dr. Galangappa Basappa Patil Entrance gate at Nippani Village in Chittapur TalukaPRED10/02/2017 8.00 02/11/20178.007.930.00Work under Progress Under Progress12/9/2017 8:25:50 AM
48 KLB165113321JewargiInstitutionalSportsGeneralConstn of RCC sitting gallery at Jewargi Stadium in Jewargi townNK02/03/2017 126.68 07/02/2017126.680.0069.134 blocks completed, 2 blocks work u/pUnder Progress11/20/2017 5:46:25 PM
49 KLB165113330JewargiInstitutionalSportsGeneralConstn of RCC drain at Jewargi Stadium in Jewargi townNK03/02/2017 18.17 03/02/201718.170.000.00Jungle clearance completed work to be start & completion of sitting galleryUnder Progress10/11/2017 11:30:01 AM
50 KLB165113370JewargiInstitutionalEducationGeneralM.Y Ghorpade G. P Building KhachapurPRED07/11/2016 50.00 02/03/201750.0045.550.00Work Order Issued - Work Under ProgressUnder Progress10/26/2017 11:21:36 AM
51 KLB165123179JewargiInfrastructureULB AminitiesGeneralConstn of Vegetable Market in Jewargi Town in Jewargi taluka (ground floor)NK30/07/2016 103.04 23/02/2017103.040.0023.02Plinth beam work u/p & column raised upto lintel levelUnder Progress11/20/2017 5:44:40 PM
52 KLB166113294ChincholiInstitutionalWater SupplyGeneralProviding water supply to Yakapur Village in Chincholi TalukaRWS19/01/2017 24.51 28/02/201724.5120.649.80ತೆರೆದ ಬಾವಿ ಕೆಲಸ ಪ್ರಗತಿಯಲ್ಲಿದೆUnder Progress11/19/2017 6:34:17 PM
53 KLB166113331SedamInstitutionalSportsGeneralIndoor Stadium in Sedam.KRIDL-205/02/2017 188.80 05/02/2017188.800.0021.81Foundation work completeUnder Progress10/27/2017 3:47:52 PM
54 KLB166113371SedamInstitutionalEducationGeneralM.Y Ghorpade G. P Building YadagaPRED07/11/2016 50.00 02/03/201750.0048.100.00wORK uNDER pROGRESSUnder Progress10/26/2017 11:18:31 AM
55 KLB166113372SedamInstitutionalEducationGeneral M.Y Ghorpade G. P Building SindhanmaduPRED07/11/2016 50.00 02/03/201750.0048.050.00Plinth Beam CompletedUnder Progress10/26/2017 11:22:15 AM
56 KLB166123170SedamInfrastructureRoads & BridgesGeneralConstruction of CC road and Drain in Ranjol Village (SC Colony) Sedam Tq. Kalaburagi Dist.KRIDL-209/02/2017 19.80 24/04/201720.100.001.00Base coat Work U/PUnder Progress12/8/2017 5:30:55 PM
57 KLB166123248SedamInfrastructureRoads & BridgesGeneralConst. of box culvert near Handarki Gate at Handarki village in Sedam.PRED17/03/2017 7.80 17/04/20177.806.450.00 Work under progress Under Progress12/5/2017 11:14:37 AM
58 KLB166123283SedamInfrastructureRoads & BridgesGeneralImprovement approach road to Amaravadi from Km. 0.00 to 1.10 in Sedam TalukaPWD SEDAM09/01/2017 85.10 28/02/201797.300.000.00Formation work under progressUnder Progress11/16/2017 1:03:50 PM
59 KLB166123285SedamInfrastructureULB AminitiesGeneralConst of convered auction plat form in main market yard of APMC Sedam.PWD SEDAM10/11/2016 114.86 16/03/2017114.860.000.00Excavation under progressUnder Progress11/16/2017 1:05:16 PM
60 KLB166123286SedamInfrastructureRoads & BridgesGeneralImprovement of road from Kanakadas Chowk to KEB Gate at Shahbad Town from km 0.00 to 0.66 in Chitapur TalukaPWD SEDAM03/04/2017 54.98 03/04/201754.980.000.00under progressUnder Progress11/16/2017 1:05:50 PM
61 KLB166123287SedamInfrastructureRoads & BridgesGeneralImprovement of road from Hongunta Cross to Kanakadas Chowk (Shahabad Bheema road km 0.00 to 1.10 at Shahabad town in Chitapur TalukaPWD SEDAM03/04/2017 119.93 03/04/2017119.930.000.00under progressUnder Progress10/7/2017 7:01:44 PM
62 KLB166123309SedamInfrastructureOthersGeneralDevelopment of Community grave yard at SedamKRIDL-216/03/2017 98.72 04/04/2017104.500.000.50Material Collation Under Progress11/19/2017 1:37:43 PM
63 KLB166313476SedamInstitutionalEducationGeneralಸೇಡಂ ತಾಲೂಕಿನ ಕೋಡ್ಲ ಗ್ರ್ರಾಮದ ಸಿದ್ದಿಪೇಟ ಸರ್ಕಾರಿ ಪ್ರಾಥಮಿಕ ಶಾಲೆಗೆ ಹೊಸದಾಗಿ ಎರಡು ಕೋಣೆಗಳನಿರ್ಮಾಣKRIDL-214/12/2016 13.00 18/01/201713.000.003.00Plinth Bheam Completed Under Progress10/24/2017 1:19:04 PM
64 KLB166313477SedamInstitutionalEducationGeneralಸೇಡಂ ತಾಲೂಕಿನ ಕೋಡ್ಲಸರ್ಕಾರಿ ಪ್ರಾಥಮಿಕಯ ಪ್ರಸ್ತುತ ಇರುವ ಒಂದು ಕೋಣೆಯನ್ನು ನೆಲಸಮ ಮಾಡಿ ಹೊಸದಾಗಿ ಒಂದು ಕೋಣೆನಿರ್ಮಾಣKRIDL-214/12/2016 8.00 30/01/20177.100.002.00Basement CompleteUnder Progress12/8/2017 5:25:48 PM
65 KLB166313479SedamInstitutionalEducationGeneralConstruction of one room building to HPSC at Huda (B) Village in Sedam TalukaKRIDL-130/01/2017 10.00 09/03/20179.620.000.20Foundation Work U/PUnder Progress11/19/2017 2:12:17 PM
66 KLB166313486SedamInstitutionalEducationGeneralನಾಡೇಪಲ್ಲಿ ಗ್ರ್ರಾಮದ ಸರ್ಕಾರಿ ಪ್ರಾಥಮಿಕ ಶಾಲೆಗೆ 04 ಹೆಚ್ಚುವರಿ ಕೋಣೆ ನಿರ್ಮಾಣ.KRIDL-221/09/2016 26.00 07/11/201625.530.004.00Basement work U/P.Under Progress11/19/2017 1:30:55 PM
67 KLB166313489SedamInstitutionalEducationGeneralConstruction of 06 Class room Building for Govt. High School at Sedam Town in Sedam TalukaKRIDL-207/10/2016 42.00 24/11/201642.000.0012.00Roof laid. Under Progress12/8/2017 5:26:19 PM
68 KLB166323435SedamInfrastructureRoads & BridgesGeneralಸೇಡಂ ತಾಲೂಕಿನ ಕೂಂಕನಳ್ಳಿ ಗ್ರ್ರಾಮದಲ್ಲಿ ಸಿಸಿ ರಸ್ತೆನಿರ್ಮಾಣ ಮಾಡುವುದು.KRIDL-216/07/2016 10.00 05/12/201610.000.001.50Basecoat Work u/pUnder Progress12/8/2017 5:41:54 PM
69 KLB166323446SedamInfrastructureRoads & BridgesGeneralಸೇಡಂ ತಾಲೂಕಿನ ಮುನಕಪಲ್ಲಿ ಗ್ರ್ರಾಮದಲ್ಲಿ ಸಿಸಿ ರಸ್ತೆನಿರ್ಮಾಣ ಮಾಡುವುದು.KRIDL-216/07/2016 20.00 05/12/201620.000.002.00Basecoat Work U/PUnder Progress12/8/2017 5:40:35 PM
70 KLB166323447SedamInfrastructureRoads & BridgesGeneralಸೇಡಂ ತಾಲೂಕಿನ ರಂಜೋಳ ಗ್ರ್ರಾಮದಲ್ಲಿ ಸಿಸಿ ರಸ್ತೆನಿರ್ಮಾಣ ಮಾಡುವುದು.KRIDL-216/07/2016 10.00 05/12/201610.000.001.00Basacot Work U/PUnder Progress11/19/2017 1:28:10 PM
71 KLB166323448SedamInfrastructureRoads & BridgesGeneralಸೇಡಂ ತಾಲೂಕಿನ ಗುಂಡಳ್ಳಿ (ಬಿ) ಗ್ರ್ರಾಮದಲ್ಲಿ ಸಿಸಿ ರಸ್ತೆನಿರ್ಮಾಣ ಮಾಡುವುದು.KRIDL-216/07/2016 20.00 05/12/201620.000.000.60material collection u/pUnder Progress10/24/2017 1:03:32 PM
72 KLB166323449SedamInfrastructureRoads & BridgesGeneralಸೇಡಂ ತಾಲೂಕಿನ ಮುಷ್ಠಳ್ಳಿ ಗ್ರ್ರಾಮದಲ್ಲಿ ಸಿಸಿ ರಸ್ತೆನಿರ್ಮಾಣ ಮಾಡುವುದು.KRIDL-216/07/2016 10.00 05/12/201610.000.001.00material collection u/pUnder Progress10/24/2017 1:03:50 PM
73 KLB166323450SedamInfrastructureRoads & BridgesGeneralಸೇಡಂ ತಾಲೂಕಿನ ರಿಬ್ಬನಪಲ್ಲಿ ಗ್ರ್ರಾಮದಲ್ಲಿ ಸಿಸಿ ರಸ್ತೆನಿರ್ಮಾಣ ಮಾಡುವುದು.KRIDL-216/07/2016 35.00 05/12/201635.000.002.00material collection u/pUnder Progress11/19/2017 1:28:24 PM
74 KLB166323451SedamInfrastructureRoads & BridgesGeneralಸೇಡಂ ತಾಲೂಕಿನ ನಾಡೇಪಲ್ಲಿ ಗ್ರ್ರಾಮದಲ್ಲಿ ಸಿಸಿ ರಸ್ತೆನಿರ್ಮಾಣ ಮಾಡುವುದು.KRIDL-216/07/2016 20.00 05/12/201620.000.0016.00Finishing work U/PUnder Progress11/19/2017 1:28:53 PM
75 KLB166323453SedamInfrastructureRoads & BridgesGeneralಸೇಡಂ ತಾಲೂಕಿನ ತೋಲಮಾಮಡಿ ಗ್ರ್ರಾಮದಲ್ಲಿ ಸಿಸಿ ರಸ್ತೆನಿರ್ಮಾಣ ಮಾಡುವುದು.KRIDL-216/07/2016 10.00 05/12/201610.000.004.00C.C. Road U/PUnder Progress11/19/2017 1:29:35 PM
76 KLB166323456SedamInfrastructureRoads & BridgesGeneralಸೇಡಂ ತಾಲೂಕಿನ ಹುಳಗೋಳ ಗ್ರ್ರಾಮದಲ್ಲಿ ಸಿಸಿ ರಸ್ತೆನಿರ್ಮಾಣ ಮಾಡುವುದು.KRIDL-216/07/2016 10.00 05/12/201610.000.000.50material collection u/pUnder Progress10/24/2017 1:06:18 PM
77 KLB166323457SedamInfrastructureRoads & BridgesGeneralಸೇಡಂ ತಾಲೂಕಿನ ದುಗನೂರು ಗ್ರ್ರಾಮದಲ್ಲಿ ಸಿಸಿ ರಸ್ತೆನಿರ್ಮಾಣ ಮಾಡುವುದು.KRIDL-216/07/2016 15.00 05/12/201615.000.002.00GSB Work U/PUnder Progress11/19/2017 1:30:04 PM
78 KLB166323459SedamInfrastructureRoads & BridgesTSPಸೇಡಂ ತಾಲೂಕಿನ ಹಂಗನಳ್ಳಿ ಗ್ರ್ರಾಮದ ಎಸ್.ಟಿ. ಓಣಿಯಲ್ಲಿ ಸಿಸಿ ರಸ್ತೆ ಮತ್ತು ಚರಂಡಿನಿರ್ಮಾಣ ಮಾಡುವುದು.KRIDL-216/12/2016 20.00 18/01/201718.160.005.00C.C. road Work U/PUnder Progress12/8/2017 5:28:41 PM
79 KLB166323466SedamInfrastructureRoads & BridgesSCPConstruction of CC Road and Drain in S.C. Colony Sompalli Village in Sedam Tq.KRIDL-207/10/2016 15.00 30/12/201614.200.000.50Basecoat Work U/PUnder Progress12/8/2017 5:38:36 PM
80 KLB166323468SedamInfrastructureSanitationSCPಜಲ್ಲೆಡಪಲ್ಲಿ ಗ್ರ್ರಾಮದ ಎಸ್.ಸಿ. ಓಣಿಯಲ್ಲಿ ಸಾಮೂಹಿಕ ಶೌಚಾಲಯನಿರ್ಮಾಣKRIDL-207/10/2016 6.00 22/12/20166.000.003.00Roof LevelUnder Progress12/8/2017 5:37:23 PM
81 KLB166323469SedamInfrastructureRoads & BridgesSCPConstruction of C.C. Road at Samkhed Tanda in Sedam Tq.KRIDL-207/10/2016 10.00 22/12/201610.000.003.00Murum Work U/PUnder Progress10/24/2017 1:12:38 PM
82 KLB166323470SedamInfrastructureRoads & BridgesSCPConstruction of C.C. Road & C.C. Drain Harijanwada (Kelgeri) at Malkhed in Sedam Tq. KRIDL-207/10/2016 10.00 22/12/20168.850.000.50Material Colletion Work U/PUnder Progress10/24/2017 1:12:53 PM
83 KLB166323471SedamInfrastructureRoads & BridgesSCPConstruction of C.C. Road in S.C. Colony at Kadacharla Village in Sedam Tq.KRIDL-207/10/2016 10.00 22/12/20169.510.001.00Basecoat Work U/P.Under Progress10/24/2017 1:13:08 PM
84 KLB166323472SedamInfrastructureRoads & BridgesTSPConstruction of C.C. Road SC Colony Yallamma Temple to Rajeev Nagar at Malkhed in Sedam Tq.KRIDL-207/10/2016 10.00 22/12/20169.720.001.00Murum Work U/PUnder Progress11/19/2017 1:43:43 PM
85 KLB166323481SedamInfrastructureRoads & BridgesTSPಸೇಡಂ ತಾಲೂಕಿನ ತೆರನಳ್ಳಿ ಗ್ರ್ರಾಮದ ಎಸ್.ಟಿ. ಓಣಿಯಲ್ಲಿ ಸಿ.ಸಿ. ರಸ್ತೆನಿರ್ಮಾಣ.KRIDL-214/12/2016 10.00 18/01/20179.970.000.50Murumn work U/P Under Progress12/8/2017 5:28:14 PM
86 KLB166323482ChincholiInfrastructureRoads & BridgesSCPConstruction of CC Road & CC Drain from Old School to Dr. B.R. Ambedkar Statue, Raykod Village in Chincholi Tq. (Sedam Constitution) Kalaburagi Dist.KRIDL-218/10/2016 15.00 06/01/201714.220.001.00Murumn work U/P.Under Progress12/8/2017 5:24:17 PM
87 KLB166323483SedamInfrastructureRoads & BridgesTSPConstruction of C.C. Road and C.C. Drain in (Siddaroad Nagar and Shrinivas Nagar) at Kurkunta Village in Sedam Tq.KRIDL-226/10/2016 15.00 30/12/201615.000.002.00Murum Work U/P.Under Progress10/24/2017 1:18:06 PM
88 KLB166323484SedamInfrastructureRoads & BridgesTSPConstruction of C.C. Road and Drain in Harijanwada at Jakapalli Village (Pullamore House to Shrithal Odake and Hoskera Anjalappa House to Main road in Sedam Tq.KRIDL-226/10/2016 15.00 30/12/201615.000.001.00Murumn work U/PUnder Progress12/8/2017 5:27:36 PM
89 KLB166323485SedamInfrastructureRoads & BridgesSCPConstruction of C.C. Road and Drain in Harijanwada at Kurkunta Village in Sedam Tq.KRIDL-226/10/2016 13.00 30/12/20168.600.003.50Work U/PUnder Progress11/19/2017 1:31:13 PM
90 KLB167113162KalaburagiInstitutionalEducationGeneralConstruction of Three Class Room and Toilet Block to Govt. HPS @ Nandikoor Village in Kalaburagi Tq.KRIDL-117/12/2016 24.50 17/12/201624.500.0023.00Finishing work U/P. Under Progress12/16/2017 4:07:39 PM
91 KLB167113181KalaburagiInstitutionalWomen & ChildGeneralConstruction of Anganwadi School in Nadisinnur Village, Kalaburagi Dist.NK25/01/2017 13.75 24/03/201713.500.005.61Column upto ground level work u/pUnder Progress10/9/2017 4:45:28 PM
92 KLB167113183KalaburagiInstitutionalFootpathsGeneralConstruction of footpath in Gulbarga University campus, KalaburagiNK16/08/2016 39.81 08/02/201740.380.004.41Kerbstones laying work u/pUnder Progress9/23/2017 12:37:25 PM
93 KLB167113184KalaburagiInfrastructureLightingGeneralProviding and fixing of street lights in Gulbarga University campus, in KalaburagiNK16/08/2016 7.52 13/02/20177.520.000.00Excavation work u/pUnder Progress9/20/2017 12:49:25 PM
94 KLB167113190KalaburagiInstitutionalOthersGeneralಕಸ್ತೂರಬಾ ಗಾಂಧಿ ಬಾಲಿಕಾ ವಸತಿ ವಿದ್ಯಾಲಯ ಕಲಬುರಗಿಗೆ ಒಂದು ಹಾಲ್ ನಿರ್ಮಾಣ NK 13.78 03/02/201713.780.003.762nd floor masonry work completed Under Progress10/9/2017 4:47:49 PM
95 KLB167113194KalaburagiInstitutionalEducationGeneralConstruction of Toilets Building to Govt. High School (Urdu) at Lalgeri Cross in Kalaburagi cityNK09/03/2017 10.00 09/03/201710.000.004.05Lintel level work u/pUnder Progress9/23/2017 12:39:34 PM
96 KLB167113195KalaburagiInstitutionalEducationGeneralConstruction of Toilets Building to Govt. Modal Primary School (Urdu) at Sonia Gandhi Colony in Kalaburagi CityNK09/03/2017 9.80 09/03/20179.800.004.67Lintel level work u/pUnder Progress9/23/2017 12:39:54 PM
97 KLB167113196KalaburagiInstitutionalEducationGeneralConstruction of Jilanabad Govt. PU College, at M.S.K. Mill KalaburagiNK01/04/2017 113.00 01/04/2017113.000.0015.65Footing work completedUnder Progress10/11/2017 5:16:02 PM
98 KLB167113202KalaburagiInstitutionalEducationGeneralConstruction of compound wall to First Grade College at Mahagaon in Kalaburagi TalukaNK27/03/2017 25.45 28/03/201725.450.0016.36Plastering work u/pUnder Progress10/9/2017 4:52:29 PM
99 KLB167113205KalaburagiInstitutionalParkGeneralDevelopment of Badepur Colony Garden in KalaburagiNK24/04/2017 24.19  0.000.000.00Bore well drilled & footpath work u/pUnder Progress11/20/2017 5:45:26 PM
100 KLB167113293ChincholiInstitutionalWater SupplyGeneralProviding water supply to Bantanalli Village in Chincholi TalukaRWS19/01/2017 24.96 28/02/201724.9621.120.00ಕೆಲಸ ಪ್ರಗತಿಯಲ್ಲಿದೆUnder Progress11/19/2017 6:37:51 PM
101 KLB167113319ChincholiInstitutionalSportsGeneralConstruction of Indoor stadium at Chincholi town Dist. Kalaburagi (Ground Floor)KRIDL-205/02/2016 155.60 05/02/2016155.600.0050.00Colomn up to Lintel LevelUnder Progress10/27/2017 3:50:14 PM
102 KLB167113338KalaburagiInstitutionalSportsGeneralRegional sprots events and activities at C.P Stadium in Dist Kalaburagi.NK08/08/2016 41.98 07/01/201641.980.0010.84Work under progressUnder Progress8/9/2017 5:42:26 PM
103 KLB167113344KalaburagiInstitutionalSportsGeneralProviding and construction of under ground water sump at C.P stadium in Dist KalaburagiNK28/03/2017 3.15 24/03/20173.150.000.00Work under progressUnder Progress8/8/2017 5:41:47 PM
104 KLB167113346KalaburagiInstitutionalSportsGeneralProvoding and fixing of saint gobain mirror in ladies and gents gym at C.P stadium in dist KalaburagiNK28/03/2017 0.35 24/03/20170.350.000.00Work under progressUnder Progress8/8/2017 5:43:42 PM
105 KLB167113357KalaburagiInstitutionalHealthGeneralConstn of meeting hall 200 capacity, male and female rest room on terrace floor at Govt hospital in KalaburgaiKRIDL-103/09/2016 43.43 07/07/201769.840.005.00Column Casting U/P.Under Progress12/16/2017 4:07:10 PM
106 KLB167113360KalaburagiInstitutionalSmart PoliceGeneralVIP refreshment area for first floor at Police parade ground KalaburagiNK22/12/2016 39.58 25/01/201739.580.004.36First floor column raised upto lintel levelUnder Progress11/20/2017 5:42:44 PM
107 KLB167113361KalaburagiInstitutionalSmart PoliceGeneralConst of primary health centre of Police parade ground kalaburagi.NK05/12/2016 16.21 25/01/201716.210.007.57Roof slab work completed Under Progress9/20/2017 12:50:49 PM
108 KLB167113362KalaburagiInstitutionalSmart PoliceGeneralRenovation and repair of indoor stadium at polie parade ground KalaburagiNK05/12/2016 16.15 25/01/201715.860.000.00Roof sheet work completedUnder Progress10/9/2017 5:23:59 PM
109 KLB167113369KalaburagiInstitutionalEducationGeneral M.Y Ghorpade G. P Building BasvapattanPRED07/11/2016 50.00 02/03/201750.0047.060.00Work Under Progress bASEMENT lEVELUnder Progress10/26/2017 11:20:51 AM
110 KLB167113387KalaburagiInstitutionalOthersGeneralConst of II nd floor KGBV Building at Kalaburagi cityNK05/02/2017 13.78 03/02/201713.780.003.082nd floor masonry work u/p ( covered inside work code serial no. KLB167113190) Under Progress10/12/2017 2:58:49 PM
111 KLB167113389KalaburagiInstitutionalEducationGeneralConst of first floor at independent PU college at dist KalaburagiNK24/03/2017 64.43 24/03/201764.430.005.22One block roof slab casted & another block roof levelUnder Progress11/20/2017 5:43:52 PM
112 KLB167113411KalaburagiInstitutionalSocialGeneralLAN networking to Wakq board, KalaburagiHKRDB25/11/2016 0.19 25/11/20160.190.000.00under progress Under Progress11/2/2017 11:01:05 AM
113 KLB167123002KalaburagiInfrastructureRoads & BridgesGeneralConstruction of Road and Drain from Gulbarga University Back Gate to Existing Culvert Via Kusnoor Village (Kusnoor Road) in Kalaburagi City.CMC29/12/2016 76.08 29/12/201676.0861.1156.73drain work completed, road work 50% completed reaming portion pending due to pole shiftingUnder Progress11/22/2017 6:26:33 PM
114 KLB167123003KalaburagiInfrastructureRoads & BridgesGeneralConstruction of road from RTO office cross to M.G. Road food ZoneCMC06/12/2016 111.90  0.0094.030.00held up due to court caseUnder Progress11/22/2017 6:27:22 PM
115 KLB167123008KalaburagiInfrastructureRoads & BridgesGeneralConst of CC road drain from approach road (Basava prabhu hostel) to Peerappa Pujari house in w.no: 38 Bidapur colony, KalaburagiCMC07/01/2017 9.31 09/02/20179.317.513.29only CC work pending due to court case stayUnder Progress11/24/2017 1:20:57 PM
116 KLB167123009KalaburagiInfrastructureRoads & BridgesGeneralFormation of drain from Ramesh Deshmukh house to behind high court compound wall in ward no 38 – 0.215 km, KalaburagiCMC02/03/2017 33.60 27/03/201733.6028.060.00physically completedUnder Progress11/22/2017 6:31:22 PM
117 KLB167123013KalaburagiInfrastructureRoads & BridgesGeneralFormation of CC road in Ahmed Nagar colony, length 0.500 km Kalaburagi.CMC04/08/2016 24.00 19/10/201634.1028.630.00Under ProgressUnder Progress11/22/2017 7:00:11 PM
118 KLB167123017KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Shahabazar to Filter Bed road in Ward No. 23 in Kalaburagi TalukaCMC20/12/2016 84.50 28/01/201786.8369.190.00Drain Work Under progressUnder Progress11/22/2017 6:34:04 PM
119 KLB167123019KalaburagiInfrastructureRoads & BridgesGeneralConstruction of road in Thilak nagar, starting from Padma Industries in Khushanuru road to Kappalpura Mahalakshmi temple, Length-1.338km.CMC28/01/2017 83.90 14/02/201787.7273.560.00Metaling work Completed Under Progress11/22/2017 7:02:03 PM
120 KLB167123021KalaburagiInfrastructureRoads & BridgesGeneralImprovement of Road From Syed Chincholi Road to Ring road in Ward No. 23 Length 1.081km in Kalaburagi CityCMC27/10/2016 118.70 05/12/2016121.6599.400.00drain work under progress Under Progress11/22/2017 7:02:43 PM
121 KLB167123024KalaburagiInfrastructureRoads & BridgesGeneralConst of CC road from Taj function hall to Himamabahai house Kalaburagi city length -0.31 km.CMC27/08/2016 40.83 28/02/201739.1032.7526.93Physically completedUnder Progress11/22/2017 7:03:20 PM
122 KLB167123026KalaburagiInfrastructureRoads & BridgesGeneralImprovement of Road stretch starting at Chithari Rudrabhumi in Jewargi main road passing through Vibuthi House, Basavamantapa and Ending at H.C. Patil house in Pawar Layout, Kalaburagi Dist.CMC28/02/2017 73.00 17/03/201773.0062.420.00drain work is completed and cc road work is under progress Under Progress11/22/2017 7:04:56 PM
123 KLB167123032KalaburagiInfrastructureRoads & BridgesGeneralFormation of cc road from Veersahaivya Kalyan mantap Om nagar to Karnataka State Govt Pensioners association building in KalaburagiCMC05/12/2016 46.30 16/03/201746.3037.330.00pending due to ugd work Under Progress11/22/2017 7:05:32 PM
124 KLB167123033KalaburagiInfrastructureRoads & BridgesGeneralConst of CC road from Kusnoor road to Kanjigeri house (Via Ratnakar and Police Mahadev House), length -0.666 km Kalaburagi city.CMC27/08/2016 99.20 28/02/201799.2085.2052.54physically completed Under Progress11/22/2017 7:06:31 PM
125 KLB167123035KalaburagiInfrastructureRoads & BridgesGeneralFormation of CC Roads from Suresh Jadhav house to Ring road via Shivamandir Prashant Nagar (A), Kalaburagi CityCMC27/08/2016 33.50 24/03/201742.7035.320.00work under progress Under Progress11/22/2017 7:08:21 PM
126 KLB167123036KalaburagiInfrastructureRoads & BridgesGeneralAsphlting of road from railway track to Mallikarjun Madanis house in sidharth nagar of CIB colony of Kalaburagi city, length – 0.605.CMC26/11/2016 45.40 08/12/201645.4037.3121.04physically completedUnder Progress11/22/2017 7:09:17 PM
127 KLB167123037KalaburagiInfrastructureRoads & BridgesGeneralImprovement of Road from Laxman Hegnal house to Prashanth Patil Nagnahalli house (Survey No. 31) of Length 873m, Kalaburagi cityCMC05/02/2017 51.20 28/02/201751.2043.090.00Work Under ProgressUnder Progress11/4/2017 5:05:24 PM
128 KLB167123038KalaburagiInfrastructureRoads & BridgesGeneralConstruction of BT road Sharanbasappa house to Desai house (Survey No. 19), Length 0.292km. Width 30 FT (OZA Layout) in Kalaburagi City, Kalaburagi Dist.CMC05/01/2017 21.10 25/01/201721.1016.561.43Work Under ProgressUnder Progress11/4/2017 5:05:57 PM
129 KLB167123039KalaburagiInfrastructureRoads & BridgesGeneralImprovement of Roads in Swasthik Nagar of Length 1519m in Kalaburagi City.CMC03/12/2016 46.00 16/03/201746.0038.100.00Changes in estimate submitted to HKRDB Under Progress11/22/2017 7:11:36 PM
130 KLB167123040KalaburagiInfrastructureRoads & BridgesGeneralFixing of name boards/Direction in Kalaburagi cityCMC25/07/2016 32.93 25/07/201632.9329.7714.17Work Under ProgressUnder Progress11/18/2017 11:39:29 AM
131 KLB167123042KalaburagiInfrastructureRoads & BridgesGeneralConstruction of BT Roads in Jayanagar Layout, Kalaburagi City, length - 0.54 kmCMC02/03/2017 60.30 25/03/201760.9054.5120.97drain work pending due encroachment Under Progress11/22/2017 7:12:20 PM
132 KLB167123047KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CC road from Godutai Arch to Shri. Desai's House (Main Road No. 1) Goduthai Layout in Kalaburagi city. 0+229kmCMC11/11/2016 15.90 09/12/201615.900.000.00Work Under ProgressUnder Progress 
133 KLB167123049KalaburagiInfrastructureRoads & BridgesGeneralConst. of CC road & drain in Shivaling nagar in (Chincholi Extension) w.no: 22 Kalaburagi city.CMC05/12/2016 131.00 29/12/2016131.10118.1396.74drain work completed metaling work under progress Under Progress11/22/2017 7:14:08 PM
134 KLB167123050KalaburagiInfrastructureRoads & BridgesGeneralConst of CC road and drains from Khayum Bagwan house to Abbubakar colony in Mulla colony of Kalaburagi city.CMC16/03/2017 42.50 20/04/201742.5037.420.00cancelledUnder Progress11/22/2017 7:15:08 PM
135 KLB167123051KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CC road and Drain from Shantappawadi house to Nathmal Seth house behind Lahoti Kalyanamantap, Gunj Bank Colony Ward No. 19, KalaburagiCMC05/02/2017 35.30 28/02/201735.3028.8811.16Under ProgressUnder Progress11/4/2017 5:12:17 PM
136 KLB167123053KalaburagiInfrastructureRoads & BridgesGeneralFormation of road from Shantinagar in front of bus stand, Kamal hotel behind 1st and 2nd lane in KalaburagiCMC01/12/2016 36.00 01/12/201636.0027.400.00physically completedUnder Progress11/22/2017 7:16:00 PM
137 KLB167123055KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CC Road and Drain from Aland Approach Road to Prakash Theater of Kalaburagi City. Length - 0.529 km.CMC28/02/2017 75.40 15/03/201775.4063.370.00Work Under ProgressUnder Progress11/22/2017 7:17:25 PM
138 KLB167123058KalaburagiInfrastructureRoads & BridgesGeneralCC Drain and Road Behind Shadab Function hall to Sri. Rouf house in Ward No. 13 in Kalaburagi City.CMC30/12/2016 19.28 30/12/201619.2814.790.00cancelled Under Progress11/22/2017 7:18:13 PM
139 KLB167123059KalaburagiInfrastructureRoads & BridgesGeneralCC Road and Drain at Raheman Colony Sri. Imam House to Sri. Khaja House Ward No. 13 in Kalaburagi CityCMC30/12/2016 17.55 30/12/201617.5513.240.00CancelledUnder Progress11/22/2017 7:18:38 PM
140 KLB167123072KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CC Road and UGD (Drain) at Leprocy Colony in Kalaburagi CityCMC03/12/2016 26.85 03/12/201626.8521.1712.27work under progress Under Progress11/22/2017 7:19:36 PM
141 KLB167123073KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CC Road from Dabarabad Cross to Rajiv Gandhi Ashraya Yojane Colony @ Jafarabad in Ward No. 22 in Kalaburagi CityCMC06/12/2016 31.50 06/12/201631.5024.400.00physically completedUnder Progress11/22/2017 7:19:54 PM
142 KLB167123074KalaburagiInfrastructureStreet LightGeneralProviding central lighting to the divider of road from Kharge petrol pump to Budha vihar in Sedam road in Kalaburagi.CMC13/10/2016 66.50 08/12/201657.0047.140.00Work Under ProgressUnder Progress11/24/2017 1:32:29 PM
143 KLB167123081KalaburagiInfrastructureStreet LightGeneralSupplying and fixing of 150 Watts High Pressure Metal Halide Street Light Fitting in Ward No. 37CMC03/03/2017 9.80 03/03/20179.807.747.16Under ProgressUnder Progress11/24/2017 1:34:29 PM
144 KLB167123085KalaburagiInfrastructureRoads & BridgesGeneralImprovement of Road from Chithari Rudrabhumi in Jewargi main road to H.C Patil house in Pawar Layout length 0.580 km Kalaburagi City.CMC24/10/2016 27.50 18/03/201773.0062.420.00Repected Wide S.No. 29 to DelectedUnder Progress10/28/2017 5:21:13 PM
145 KLB167123086KalaburagiInfrastructureRoads & BridgesGeneralImprovement & Repairs of CC Roads and Drain from Aland Ring Road Via Santosh colony in Ward No. 22 in Kalaburagi length 1.165CMC24/10/2016 133.10 05/12/2016135.00122.7957.75physically completedUnder Progress11/22/2017 7:20:11 PM
146 KLB167123090KalaburagiInfrastructureRoads & BridgesGeneralConstruction of Road in Rajapura - Badepura Colony, from S.P. Sullad House to Other Roads of the Colony, Kalaburagi City. Length - 1.261 km.CMC22/11/2016 94.40 05/12/201694.4075.980.00Work Under ProgressUnder Progress11/22/2017 7:20:46 PM
147 KLB167123091KalaburagiInfrastructureRoads & BridgesGeneralConstruction of Storm water Drain from New RTO Office Ring Road to Pooja Colony main road (Kusnoor Road) W.No. 30 in Kalaburagi CityCMC06/12/2016 146.75 06/12/2016146.7597.4756.72Work Under ProgressUnder Progress11/22/2017 7:21:18 PM
148 KLB167123096KalaburagiInfrastructureRoads & BridgesGeneralConstruction of Strom Water Drain from Old Jewargi Railway under Bridge to Govt. Womens Degree College at Ward No. 54 in Kalaburagi CityCMC26/11/2016 70.00 26/11/201670.0058.1141.02physically completedUnder Progress11/24/2017 1:37:44 PM
149 KLB167123101KalaburagiInfrastructureRoads & BridgesGeneralWidening of CC road and Slab on Existing storm water drain from Balabhavan to S.M. Pandit RangamandirCMC28/01/2017 16.03 28/01/201716.0314.130.00Work Under ProgressUnder Progress11/22/2017 7:23:30 PM
150 KLB167123103KalaburagiInfrastructureRoads & BridgesGeneralWidening of CC road and rising of existing drain wall from MSK mill main road to Venkatesh Nagar W. No. 51CMC28/01/2017 19.98 28/01/201719.9815.6310.87physically completedUnder Progress11/22/2017 7:23:44 PM
151 KLB167123104KalaburagiInfrastructureRoads & BridgesGeneralWidening of CC Road from SVP Circle to Railway Station one way road at W. No. 52CMC28/01/2017 19.37 28/01/201719.3718.970.00physically completedUnder Progress11/22/2017 7:23:55 PM
152 KLB167123112KalaburagiInfrastructureRoads & BridgesGeneralFormation of CC road infront of razak frutewale house to peer janani darga road vai Nahim Mechanic Shahapur house in Madia colony in Ward no 21 kalaburagiCMC09/02/2017 35.41 09/02/201735.4128.3016.04delayed due to ugd work, drain work completed, road work under progress Under Progress11/22/2017 7:24:45 PM
153 KLB167123113KalaburagiInfrastructureRoads & BridgesGeneralFormation of Road with Drain from Qadir Chowk to SI Corporation office vai SBH Bank in Iqbal colony ward no 20 Kalaburagi cityCMC09/02/2017 114.00 09/02/2017114.00112.500.00drain work completed, road work under progress, within 15 days work will be completed Under Progress11/22/2017 7:25:25 PM
154 KLB167123115KalaburagiInfrastructureRoads & BridgesGeneralConstruction off CC road and drain at Sahasrarjun Nagar in Datta Nagar W no 23 in Kalaburagi cityCMC09/02/2017 155.00 09/02/2017155.00150.980.00Under progressUnder Progress11/4/2017 5:38:47 PM
155 KLB167123121KalaburagiInfrastructureRoads & BridgesGeneralConst of strom water drain from main culvert vijaya nagar colony Kalaburagi City.CMC29/12/2016 30.90 29/12/201730.9025.900.00Work Under progressUnder Progress11/4/2017 5:39:47 PM
156 KLB167123126KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CC Road from Hagargi House to Veerupakshagouda House in Om Nagar Ward No. 30 Kalaburagi CityCMC16/03/2017 30.00 16/03/201730.0024.9910.25physically completedUnder Progress11/22/2017 7:25:52 PM
157 KLB167123129KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CC Road from Heroor house to Pawar house in Swastik Nagar Ward No. 30 Kalaburagi City.CMC16/03/2017 11.10 16/03/201711.109.000.00delayed due to ugd work, metaling work under progress Under Progress11/22/2017 7:27:28 PM
158 KLB167123133KalaburagiInfrastructureRoads & BridgesGeneralConstruction of RCC Storm water Drain from Dhobighat to Corporation Workshop at W/No. 33 in Kalaburagi CityCMC16/03/2017 59.00 16/03/201759.0057.9935.27physically completedUnder Progress11/22/2017 7:27:43 PM
159 KLB167123182KalaburagiInfrastructureOthersGeneralConstruction of Compound wall and Parking Shed to District Consumer Forum, KalaburagiNK08/02/2017 7.56 10/02/20177.560.003.47Plastering work u/pUnder Progress10/9/2017 5:26:28 PM
160 KLB167123189KalaburagiInfrastructureOthersGeneralConstructin of 5 steps stone masonry seating gellery at Police Ground at Kalaburagi Taq.NK06/04/2017 68.61 06/04/201768.610.0021.862 side footing & column upto 10ft work completed & step masonry work u/pUnder Progress10/9/2017 5:27:31 PM
161 KLB167123211KalaburagiInfrastructureRoads & BridgesGeneralFormation of road from Nagur village to Nagur tanda (Nagur rehabilitation centre) km 1.90, Kalaburagi TalukaPMGSY16/07/2016 84.90 02/10/201691.1073.420.00Sub-Grade completed,CD and GSB UNDER PROGRESS Under Progress10/30/2017 4:59:19 PM
162 KLB167123213KalaburagiInfrastructureRoads & BridgesGeneralRoad from Farahtabad (NH-218) to Kirangi via Tilgul upto Taluka border km 0.00 to 10.00 in Kalaburagi talukaPMGSY28/02/2017 494.62 06/03/2017494.62394.810.005km sub-grade completed,2km GSB completed,5cd completed,17vents LLC u/pUnder Progress12/15/2017 5:34:00 PM
163 KLB167123250KalaburagiInfrastructureRoads & BridgesGeneralProviding C.C. Road from Agasi Darga to Gram Panchayat open well in Kawalaga (B) Village in Kalaburagi TalukaPRED27/04/2017 13.60 27/04/201713.6012.870.00Work under progress Under Progress12/8/2017 12:28:30 PM
164 KLB167123251KalaburagiInfrastructureRoads & BridgesGeneralConstruction of road from Shahabad road (Indian oil Pretrol Pump) to Kusanoor road Kalaburagi City. Length - 0.870 km.PWD KLB25/01/2017 77.84 08/03/201787.7468.700.00Nearing CompletionUnder Progress11/19/2017 9:25:59 PM
165 KLB167123256KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Okali Camp 60ft road to Bhagyanagar via Chetan PU College and Internal roads in NGO colony sedam road, Kalaburagi city.PWD KLB03/12/2016 74.50 21/03/201780.7063.210.00Work under progressUnder Progress11/19/2017 9:28:48 PM
166 KLB167123297KalaburagiInfrastructureRoads & BridgesGeneralEstimate for Basaveshwar Colony 4th Cross to Join to MG Road (Shankrepa Batle House to Gurubasappa House via Jitendra Aeri house) in Kalaburagi CityCMC24/04/2017 10.00 24/04/201710.008.3198.10Under ProgressUnder Progress11/4/2017 5:44:43 PM
167 KLB167123304KalaburagiInfrastructureOthersGeneralProviding construction and erection of parliment bhavan at Ambedkar fountain in District KalaburagiNK17/03/2017 12.41 17/03/201712.410.004.50Work under progressUnder Progress8/8/2017 6:18:38 PM
168 KLB167123305KalaburagiInfrastructureOthersGeneralProviding construction and erection of Astalinga at Basaveshwar fountain in District KalaburagiNK18/03/2017 15.57 17/03/201715.570.005.60Work under progressUnder Progress8/8/2017 6:19:25 PM
169 KLB167123307KalaburagiInfrastructureRoads & BridgesGeneralRoad side landscaping and boulevard for Rajapur road Kalaburagi.CMC09/12/2016 135.00 02/03/201782.5579.090.00Work Under ProgressUnder Progress11/4/2017 5:45:09 PM
170 KLB16721437KalaburagiInstitutionalEducationGeneralಕಲಬುರಗಿ ತಾಲೂಕಿನ ಶೇಖರೋಜಾಸರ್ಕಾರಿ ಉರ್ದು ಹಿರಿಯ ಪ್ರಾಥಮಿಕ ಶಾಲೆಗೆ ಕೋಣೆನಿರ್ಮಾಣ ಮತ್ತು ಬೋರವೇಲ್ ಕೊರೆಯುವುದು.PWD KLB28/03/2017 20.00 26/09/201720.0018.530.00Under progress. Under Progress11/19/2017 9:46:45 PM
171 KLB167423420kalaburagiInfrastructureRoads & BridgesGeneralಕಲಬುರಗಿ ತಾಲ್ಲೂಕಿನ ಮಹಾಗಾಂವ ಗ್ರಾಮದ ಪೋಲಿಸ ಸ್ಷೇಷನ್ ಹಿಂಭಾಗದ ಬೀದರ-ಕಲಬುರಗಿ ಹೆದ್ದಾರಿಯಲ್ಲಿರುವ ಉದ್ದೇಶಿತ ಮಹಾಗಾಂವ ಕ್ರೀಡಾಂಗಣಕ್ಕೆ ರಸ್ತೆನಿರ್ಮಾಣPWD KLB10/02/2017 25.00  0.0022.630.00Under progressUnder Progress11/19/2017 9:43:18 PM
172 KLB167423421kalaburagiInfrastructureRoads & BridgesGeneralಕಲಬುರಗಿ ತಾಲ್ಲೂಕಿನ ಮಹಾಗಾಂವ ಗ್ರಾಮದ ಹೀರಾಸಾಬ ಮನೆಯಿಂದ ವಾಯಾ ಶ್ರೀ ಕಳ್ಳಿಮಠ-ಮಹಾಗಾಂವವಾಡಿ ಕೂಡು ರಸ್ತೆವರೆಗೆ ಸಿ.ಸಿ ರಸ್ತೆ ಮತ್ತು ಚರಂಡಿನಿರ್ಮಾಣPWD KLB10/02/2017 15.00 26/09/201715.0014.240.00Under progressUnder Progress11/19/2017 9:45:42 PM
173 KLB168113350KalaburagiInstitutionalHealthGeneralDe-installation, Packaging, transportation, Re-installation and QA of the CT scanning Machine to Sub Division Hospital Gangavati Dist. KoppalDistrict Surgen Gulbarga03/01/2017 5.75 03/01/20175.750.000.00work approved and amount release Under Progress12/7/2017 4:28:03 PM
174 KLB168113403KalaburagiInstitutionalHealthGeneralRepairs to single slice CT Scan Machine at Gulbarga Dist Hospital and Shifting of this equipment to Bellary Dist HospitalDist Surgeon Kalaburagi07/11/2016 7.52 07/11/20167.520.000.00Ltr written to DC on 14.07.2017 for Final releaseUnder Progress 
         8214.93 8136.614533.511611.79