LIST OF Under Progress MACRO WORKS

  Workcode Taluka Type Subtype Category Work Name Agency Plan Approved Date Allocation ADM Approved Date ADM Amount Work Order Amt Exp Stages of Work Status Updated On
 
Sl.NoWorkcodeTal_NameSub TypeSectorCategoryWORK NAMEAGENCY NAMEPlan App DATEAllocationAdm APP DateADM AmtWO AmtEXPStages of workStatus Type NameLast Modified
1 KLB151413251AfzalpurInfrastructureRoads & BridgesGeneralFormation of road from Takkalaki village to old chowadeshwari temple in Afzalpur talukPRED22/06/2015 47.83 05/01/201647.8346.348.92B T to be DoneUnder Progress12/6/2017 12:46:42 PM
2 KLB152113042AlandInfrastructureSanitationGeneralConstruction of Public Tiolet for Women in Ningadalli village of Aland talukPRED24/09/2015 4.50 09/11/20154.504.451.45ಬೇಸಮೆಂಟ ಲೆವಲ Under Progress11/9/2017 3:21:22 PM
3 KLB152623230AlandInfrastructurewater supplyGeneralProviding addl 250 KVA transformer @ Nimbarga MVS jackwell in Aland taluka RWS23/12/2016 7.41 23/12/20167.417.100.00ಕೆಲಸ ಪ್ರಗತಿಯಲ್ಲಿದೆUnder Progress11/19/2017 4:45:11 PM
4 KLB153113197ChincholiInfrastructureNemmadi UruGeneralNemmadi Uru Chincholi: Town HallKRIDL-226/08/2016 199.80 26/08/2016199.800.0050.00Lintel LevelUnder Progress11/19/2017 1:10:20 PM
5 KLB153113198ChincholiInfrastructureNemmadi UruGeneralNemmadi Uru Chincholi: Shopping MallKRIDL-218/01/2016 199.00 18/01/2016199.000.00170.00Nearing CompletionUnder Progress11/19/2017 1:08:29 PM
6 KLB153113199ChincholiInfrastructureNemmadi UruGeneralRCC drain with footpath from Gandhi Chowk to Tandur cross Chandapur in Chincholi TownKRIDL-218/01/2016 142.55 17/12/2016122.330.0040.00C.C. Drain Work U/P.Under Progress11/19/2017 1:10:58 PM
7 KLB153123008ChincholiInfrastructureRoads & BridgesGeneralImprovement and repair of road from Syed Chincholli to Jumbaga(B)PMGSY12/01/2016 273.30 23/02/2016264.90228.26144.96 GR-III Completed.BT to be started.Under Progress10/30/2017 4:40:28 PM
8 KLB153123009ChincholiInfrastructureRoads & BridgesGeneralImprovement to road from Syed Chincholi to Aloor NaronaPMGSY12/01/2016 498.50 23/02/2016495.10406.81260.747.70 km BT completed ,Balance CC road Under progressUnder Progress10/24/2017 11:52:41 AM
9 klb153123284ChincholiInfrastructureWater SupplyGENERALInstallation of WPP plant in Ranapur village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00ಬೆಸಮೆಂಟ್ ಮುಗಿದಿದೆUnder Progress11/19/2017 4:46:15 PM
10 klb153123285ChincholiInfrastructureWater SupplyGENERALInstallation of WPP plant in Jettur village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00ಪೊತಂಗಲ ಗ್ರಾಮಕ್ಕೆ ಬದಲಾಯಿಸಲಾಗಿದೆ ಬೆಸಮೆಂಟ್ ಮುಗಿದಿದೆUnder Progress11/19/2017 4:46:30 PM
11 klb153123286ChincholiInfrastructureWater SupplyGENERALInstallation of WPP plant in Mukaramba village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00ಬೆಸಮೆಂಟ್ ಮುಗಿದಿರುತ್ತದೆUnder Progress11/19/2017 4:46:46 PM
12 KLB153123318ChincholiInfrastructureWater SupplyGENERALInstallation of WPP plant in Halchera village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00ಬೆಸಮೆಂಟ್ ಮುಗಿದಿದೆUnder Progress11/19/2017 4:47:05 PM
13 KLB154123202ChittapurInstitutionalTransportGeneralConst of bus shelter at Nagavi temple in chittapurNK09/03/2017 10.00 08/03/201710.000.003.69Borewell drilling completed & lintel levelUnder Progress10/10/2017 1:19:01 PM
14 KLB154123204ChittapurInstitutionalTransportGeneralConst of bus shelter at near court in chittapur townNK09/03/2017 10.00 08/03/201710.000.003.51Borewell drilling completed & lintel levelUnder Progress10/10/2017 1:19:45 PM
15 KLB154123205ChittapurInstitutionalTransportGeneralConst of bus shelter at lodging cross in chittapur townNK09/03/2017 10.00 08/03/201710.000.003.69Borewell drilling completed & plinth work u/pUnder Progress10/10/2017 1:20:28 PM
16 KLB154123206ChittapurInstitutionalTransportGeneralconst of bus shelter near KRSTC bus depot in chittapur townNK09/03/2017 10.00 08/03/201710.000.003.78Borewell drilling completed & plinth work completedUnder Progress10/10/2017 1:21:03 PM
17 klb154123289ChittapurInfrastructureWater SupplyGENERALInstallation of WPP plant in Sankarwadi village under Jalamrith RWS11/01/2016 4.45 11/01/20164.453.810.00ಗುಂಡುಗುತಿ ಗ್ರಾಮಕ್ಕೆ ಬದಲಾಯಿಸಲಾಗಿದೆ ಹಾಗೂ ಬೆಸಮೆಂಟ್ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ Under Progress11/19/2017 4:57:36 PM
18 klb154123290ChittapurInfrastructureWater SupplyGENERALInstallation of WPP plant in Mogla village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00ಸುಗೂರ.ಕೆ ಗ್ರಾಮಕ್ಕೆ ಬದಲಾಯಿಸಲಾಗಿದೆ Under Progress11/19/2017 5:33:48 PM
19 KLB154413248ChittapurInstitutionalschoolGeneralConstruction of 3 rooms to Govt. High School at KalagiPRED18/01/2016 20.00 19/07/201620.0019.2615.68Roof Laid Under Progress12/5/2017 10:40:09 AM
20 KLB154413249ChittapurInstitutionalschoolGeneralConstruction of 2 rooms Govt. High school at Bedsoor village in Chittapur TalukaPRED18/01/2016 20.00 12/09/201620.0019.240.00Finishing work under progress Under Progress12/11/2017 10:57:54 AM
21 KLB155113064JewargiInfrastructureSanitationGeneralConstruction of Public Tiolet in Balabatti village of Jewaragi talukPRED24/09/2015 4.50 26/09/20154.504.450.00basement completedUnder Progress11/9/2017 3:34:36 PM
22 KLB155123093JewargiInfrastructureRoads & BridgesGeneralConsruction of CC road from Sharanappa Jainapur House to Govt School & ST colony to Main road in Naribol village, Jewargi talukPRED09/10/2015 15.00 28/01/201714.9014.619.38 C C Completed Under Progress12/5/2017 10:50:54 AM
23 KLB155123207JewargiInfrastructureNemmadi UruGeneralNemmadi Uru Jewargi: Town HallPWD KLB17/09/2016 196.65 17/09/2016196.95188.0135.95Columns raised upto roof levelUnder Progress11/19/2017 8:21:21 PM
24 KLB155123208JewargiInfrastructureNemmadi UruGeneralNemmadi Uru Jewargi: Shopping MallKRIDL-108/02/2016 199.21 02/08/2016199.210.00110.00Roof LaidUnder Progress12/16/2017 3:56:38 PM
25 KLB155123209JewargiInfrastructureNemmadi UruGeneralElectirfication work at ward no 38 and installation of Controlling point in JewargiTMC JEWARGI12/01/2016 31.15 01/03/201727.9618.602.00Work Under ProgressUnder Progress11/16/2017 1:05:27 PM
26 klb155123293JewargiInfrastructureWater SupplyGENERALInstallation of WPP plant in Kurnalli village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00ಬೆಸಮೆಂಟ್ ಮಗಿದಿರುತ್ತದೆUnder Progress11/19/2017 5:34:25 PM
27 klb155123294JewargiInfrastructureWater SupplyGENERALInstallation of WPP plant in Varchanalli village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00ಬೆಸಮೆಂಟ್ ಮುಗಿದಿರುತ್ತದೆUnder Progress11/19/2017 5:27:44 PM
28 klb155123295JewargiInfrastructureWater SupplyGENERALInstallation of WPP plant in Gogihal village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00ಬೆಸಮೆಂಟ್ ಮುಗಿದಿರುತ್ತದೆUnder Progress11/19/2017 5:28:00 PM
29 klb155123296JewargiInfrastructureWater SupplyGENERALInstallation of WPP plant in Revnoor village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00ಬೆಸಮೆಂಟ್ ಮುಗಿದಿದೆUnder Progress11/19/2017 5:28:18 PM
30 klb155123297JewargiInfrastructureWater SupplyGENERALInstallation of WPP plant in Mallabad village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00ಬೆಸಮೆಂಟ್ ಮುಗಿದಿದೆUnder Progress11/19/2017 5:28:42 PM
31 KLB155123298JewargiInfrastructureWater SupplyGENERALInstallation of WPP plant in Kattisangavi village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00ಬೆಸಮೆಂಟ್ ಮುಗಿದಿದೆUnder Progress11/19/2017 5:28:58 PM
32 KLB155123299JewargiInfrastructureWater SupplyGENERALInstallation of WPP plant in Briyal.k village under JalamrithRWS  4.45 11/01/20164.453.810.00ಬೆಸಮೆಂಟ್ ಮುಗಿದಿದೆUnder Progress11/19/2017 5:29:14 PM
33 KLB155123300JewargiInfrastructureWater SupplyGENERALInstallation of WPP plant in Kallur.B village under JalamrithRWS11/01/2016 4.45 11/01/20164.454.450.00ಬೆಸಮೆಂಟ್ ಮುಗಿದಿದೆUnder Progress11/19/2017 5:29:28 PM
34 KLB156113081SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Duganur village of Sedam talukRWS24/09/2015 1.50 19/11/20151.500.990.00ಕೆಲಸ ಪ್ರಗತಿಯಲ್ಲಿದೆUnder Progress11/19/2017 5:36:04 PM
35 KLB156123074SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt. LPS School premises of Indira ngar Fasaladi tanda of Sedam talukRWS24/09/2015 1.50 23/11/20151.500.990.00ಕೆಲಸ ಪ್ರಗತಿಯಲ್ಲಿದೆUnder Progress11/19/2017 5:38:57 PM
36 KLB156123075SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt. High School premises of Neelahalli village of Sedam talukRWS24/09/2015 1.50 19/11/20151.500.990.00ಕೆಲಸ ಪ್ರಗತಿಯಲ್ಲಿದೆUnder Progress11/19/2017 5:39:18 PM
37 KLB156123211SedamInfrastructureNemmadi UruGeneralNemmadi Uru Sedam: Town HallKRIDL-101/09/2016 199.94 01/09/2016199.940.00100.00Ground Floor Roof Laid Plastring U/PUnder Progress10/8/2017 4:04:38 PM
38 KLB156123212SedamInfrastructureNemmadi UruGeneralNemmadi Uru Sedam: Shopping MallKRIDL-217/09/2016 150.00 17/09/2016199.940.0045.00Lintel Level Under Progress12/8/2017 5:44:41 PM
39 klb156123310SedamInfrastructureWater SupplyGENERALInstallation of WPP plant in Devnoor village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00ಬೆಸಮೆಂಟ್ ಮುಗಿದಿದೆUnder Progress11/19/2017 5:41:16 PM
40 klb156123311SedamInfrastructureWater SupplyGENERALInstallation of WPP plant in Yanagundi village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00ರುದ್ರವಾರ ಗ್ರಾಮಕ್ಕೆ ಬದಲಾಯಿಸಲಾಗಿದೆUnder Progress11/19/2017 5:41:51 PM
41 klb156123312SedamInfrastructureWater SupplyGENERALInstallation of WPP plant in Boothpur village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00ಬೆಸಮೆಂಟ್ ಮುಗಿದಿರುತ್ತದೆUnder Progress11/19/2017 5:42:32 PM
42 KLB156123313SedamInfrastructureWater SupplyGENERALInstallation of WPP plant in Turnoor (Kalkamba ) village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00ಬೆಸಮೆಂಟ್ ಮುಗಿದಿದೆUnder Progress11/19/2017 5:42:56 PM
43 KLB156123314SedamInfrastructureWater SupplyGENERALInstallation of WPP plant in Hayyal village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00ಬೆಸಮೆಂಟ್ ಮುಗಿದಿರುತ್ತದೆUnder Progress11/19/2017 5:43:19 PM
44 KLB156123315SedamInfrastructureWater SupplyGENERALInstallation of WPP plant in Bijanalli village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00ಬೆಸಮೆಂಟ್ ಮುಗಿದಿರುತ್ತದೆUnder Progress11/19/2017 5:43:34 PM
45 KLB156123316SedamInfrastructureWater SupplyGENERALInstallation of WPP plant in Bilkal village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00ಬೆಸಮೆಂಟ್ ಮುಗಿದಿರುತ್ತದೆUnder Progress11/19/2017 5:49:39 PM
46 KLB156123317SedamInfrastructureWater SupplyGENERALInstallation of WPP plant in Arebhomnalli village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00ಮದಕಲ ಗ್ರಾಮಕ್ಕೆ ಬದಲಾಯಿಸಲಾಗಿದೆUnder Progress11/19/2017 5:50:04 PM
47 KLB157113169KalaburagiInstitutionalPark GeneralConstruction of footpath outside compound wall @ Rajiv Gandhi Theme park, KalaburagiNK30/09/2015 38.49 29/09/201538.490.0024.35work under progressUnder Progress10/9/2017 3:44:50 PM
48 KLB157113170KalaburagiInstitutionalPark GeneralProviding & fixing of street light at Rajiv gandi theme park kalaburagiNK23/12/2015 47.78 23/12/201547.780.000.00WORK under progressUnder Progress8/8/2017 12:58:27 PM
49 KLB157113172KalaburagiInstitutionalPark Generalconstn of Chain link fencing for Public exhibition ground Kotnoor D Park, KalaburagiNK26/08/2016 34.10 13/02/201733.120.005.77 Front side column castedUnder Progress10/9/2017 3:47:24 PM
50 KLB157113188AfzalpurInstitutionalSportsGeneralConstruction of pavilion building at Stadium in Afzalpur town Dist Kalaburagi part IKRIDL-218/01/2016 154.10 18/01/2016154.10154.1060.00Coloum Up to Lintel Level Under Progress11/19/2017 1:15:11 PM
51 KLB157113189AfzalpurInstitutionalSportsGeneralConstruction of cricket ground, Cricket pitch and Gallery in Afzalpur town Dist Kalaburagi part IIKRIDL-218/01/2016 141.00 18/01/2016141.00141.0060.00Grallary Roofing Centering Work U/P Under Progress11/19/2017 1:15:51 PM
52 KLB157113190AfzalpurInstitutionalSportsGeneralConstruction of compound wall and shelter above Sitting Gallery to Taluka level Stadium at Afzalpur town Dist Kalaburagi KRIDL-225/01/2016 103.75 25/01/2016103.75103.7580.00Compound Wall Completed & Other Work U/P Under Progress11/19/2017 1:16:31 PM
53 KLB157113194KalaburagiInstitutionalSportsGeneralProviding and supplying Tar felt sheet water proofing to indoor stadium at C P Stadium in Dist. KalaburagiNK08/08/2016 11.18 02/03/201710.600.002.09Work u/pUnder Progress10/7/2017 6:04:24 PM
54 KLB157123004KalaburagiInfrastructureRoads & BridgesGeneralFormation of BT road from old jewargi road to PNT cross via Ganadevate to Naganhalli approach road in ward no 54 of KlaburagiPWD KLB21/08/2015 186.80 07/11/2015179.22161.0291.80700 m BT completed balance work delayed due to UGD work taken by the KUWSDB. Now work resumed under progressUnder Progress11/19/2017 8:21:50 PM
55 KLB157123007KalaburagiInfrastructureRoads & BridgesGeneralImprovement and repair to road from Margutti cross to Bidar Border (via swanth pattwad village) in Kalaburagi PWD KLB11/03/2016 487.20 04/10/2016487.20403.450.00Work under progressUnder Progress11/19/2017 8:23:09 PM
56 KLB157123096KalaburagiInfrastructureRoads & BridgesGeneralFormation of road from Udanoor village to Minajagi village 6.00 kmPRED13/07/2016 394.65 17/07/2017394.65394.650.00ಮಂಡಳಿ ಅದೇಶ ಸಂ 1260 ದಿ.23-08-2017 ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುದಾನ ರೂ 355.30 ಲಕ್ಷ ಇದ್ದು ಗುತ್ತಿಗೆದಾರರು ರೂ 39.59 ಹೆಚ್ಚುವರಿಯಾಗಿ ನಮೋದಿಸಿರುತ್ತಾರೆ ಕಾರಣ ಸದರಿ ಮೊತ್ತವನ್ನು ಪರಿಷ್ಕರಿಸಿ ರೂ 394.65 ಲಕ್ಷಕ್ಕೆ ಅನುಮೋದನೆ ನೀಡಲಾಗಿದ Work under progress Under Progress12/5/2017 10:48:27 AM
57 KLB157123130KalaburagiInfrastructureRoads & BridgesGeneralFormation of Road from Aurad (K) village rehabitation centre to Herur village of Kalaburagi talukPRED13/07/2016 275.02 12/01/2017272.80261.680.00Work under progress Under Progress11/9/2017 4:11:08 PM
58 KLB157123162KalaburagiInstitutionalPark GeneralConstruction of Fountain in Makrana marbal 3 no. @ Rajiv Gandhi Theme Park KalaburagiNK22/07/2015 28.02 22/07/201528.020.0029.00Installation of Makarana marble is completed & finishing work completed & electrification work to be doneUnder Progress8/9/2017 6:46:29 PM
59 KLB157123163KalaburagiInstitutionalPark GeneralConstruction of Fountain in Makrana marbal bodhi desing @ Rajiv Gandhi Theme Park KalaburagiNK22/07/2015 10.33 22/07/201510.330.0010.59Installation of Makarana marble is completed & finishing work completed & electrification work to be doneUnder Progress8/9/2017 6:46:47 PM
60 KLB157123164KalaburagiInstitutionalPark GeneralConstruction of Fountain in Makrana marbal 2 no @ Public Exhibition Ground GDA layout KalaburagiNK22/07/2015 18.68 22/07/201518.680.0019.31Installation of makarana marble is completed & finshing work completed & electrification work to be doneUnder Progress8/9/2017 6:47:11 PM
61 klb157123304KalaburagiInfrastructureWater SupplyGENERALInstallation of WPP plant in Bolewad village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00ಪ್ಲಾಂಟ್ ಅಳವಡಿಸಲಾಗಿದೆUnder Progress11/19/2017 5:58:24 PM
62 klb157123306KalaburagiInfrastructureWater SupplyGENERALInstallation of WPP plant in Azadpur village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00ಪ್ಲಾಂಟ್ ಅಳವಡಿಸಲಾಗಿದೆUnder Progress11/19/2017 6:01:03 PM
63 KLB157123307KalaburagiInfrastructureWater SupplyGENERALInstallation of WPP plant in Balawad village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00ಪ್ಲಾಂಟ್ ಅಳವಡಿಸಲಾಗಿದೆUnder Progress11/19/2017 6:01:17 PM
64 KLB157123308KalaburagiInfrastructureWater SupplyGENERALInstallation of WPP plant in Thilagul village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00ಬೆಸಮೆಂಟ್ ಮುಗಿದಿರುತ್ತದೆUnder Progress11/19/2017 6:01:33 PM
65 KLB157123309KalaburagiInfrastructureWater SupplyGENERALInstallation of WPP plant in Venkat Bannur village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00ಪ್ಲಾಂಟ್ ಅಳವಡಿಸಲಾಗಿದೆUnder Progress11/19/2017 6:01:47 PM
66 KLB157613242KalaburagiInstitutionalLibraryGeneralConst of Class room, library building at MahagaonNK12/01/2016 91.43 12/01/201685.470.0070.69Plastering work under progressUnder Progress11/30/2017 4:31:52 PM
67 KLB157623232KalaburagiInstitutionalCollegeGeneralRepairs & renovation to ITI College Workshop building @ KalaburagiNK22/07/2015 41.20 30/03/201541.200.0035.29Finishing stageUnder Progress11/30/2017 4:32:30 PM
68 KLB157623234KalaburagiInstitutionalCollegeGeneralConstn of Govt ITI College renovation work at Kalaburagi NK08/03/2016 19.80 08/03/201619.800.003.00Work u/pUnder Progress11/30/2017 4:33:22 PM
69 KLB157623235KalaburagiInstitutionalCollegeGeneralConstn of third floor to Govt Pre University girls college Building at Kalaburagi NK13/01/2016 73.45 13/01/201673.450.0072.55Finishing stageUnder Progress11/30/2017 4:33:42 PM
         4530.97 4528.582683.261573.19