LIST OF Completed MACRO WORKS

  Workcode Taluka Type Subtype Category Work Name Agency Plan Approved Date Allocation ADM Approved Date ADM Amount Work Order Amt Exp Stages of Work Status Updated On
 
Sl.NoWorkcodeTal_NameSub TypeSectorCategoryWORK NAMEAGENCY NAMEPlan App DATEAllocationAdm APP DateADM AmtWO AmtEXPStages of workStatus Type NameLast Modified
1 KLB151113019AfzalpurInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Mallabad Village of Afzalpur talukRWS24/09/2015 1.50 18/01/20161.500.990.00ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 4:24:44 PM
2 KLB151113020AfzalpurInstitutionalWater supplyGeneralProvision of RO Plants in Govt. High School premises of Chincholli Village of Afzalpur talukRWS24/09/2015 1.50 18/01/20161.500.990.00ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 4:25:19 PM
3 KLB151113021AfzalpurInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Chnincholli Village of Afzalpur talukRWS24/09/2015 1.50 18/01/20161.500.990.00ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 4:25:48 PM
4 KLB151113022AfzalpurInfrastructureSanitationGeneralConstruction of Public Tiolet for Women in Shiva bala nagar village of Afzalpur talukPRED24/09/2015 4.50 19/11/20154.504.453.84CompletedCompleted11/9/2017 3:20:02 PM
5 KLB151113024AfzalpurInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Sonna Village of Afzalpur talukRWS24/09/2015 1.50 18/01/20161.500.990.00ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 4:26:08 PM
6 KLB151113025AfzalpurInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Jewargi (B) Village of Afzalpur talukRWS24/09/2015 1.50 18/01/20161.500.990.00ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 4:26:28 PM
7 KLB151113026AfzalpurInfrastructureSanitationGeneralConstruction of Public Tiolet for Women in Chinamageri village of Afzalpur talukPRED24/09/2015 4.50  0.004.454.30CompletedCompleted8/7/2017 8:03:46 PM
8 KLB151123023AfzalpurInstitutionalWater supplyGeneralProvision of RO Plants in Govt. High School premises of Bankalaga Village of Afzalpur talukRWS24/09/2015 1.50 18/01/20161.500.990.00ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 4:26:59 PM
9 KLB151123279AfzalpurInfrastructureWater SupplyGENERALInstallation of WPP Plant in Bhognalli Village under JalamrithRWS01/11/2016 4.45 11/01/20164.453.811.91ಪ್ಲಾಂಟ್ ಕಮಿಷನಡ್Completed11/19/2017 4:30:27 PM
10 KLB151123280AfzalpurInfrastructureWater SupplyGENERALInstallation of WPP Plant in Chowdapur & Tanda Village under JalamrithRWS01/11/2016 4.45 11/01/20164.453.812.67ಪ್ಲಾಂಟ್ ಕಮಿಷನಡ್ Completed11/19/2017 4:30:45 PM
11 KLB151123281AfzalpurInfrastructureWater SupplyGENERALInstallation of WPP Plant in Shirwal Village under JalamrithRWS01/11/2016 4.45 11/01/20164.453.811.14ಪ್ಲಾಂಟ್ ಕಮಿಷನಡ್Completed11/19/2017 4:31:02 PM
12 KLB151123282AfzalpurInfrastructureWater SupplyGENERALInstallation of WPP Plant in Bhosga Village under JalamrithRWS01/11/2016 4.44 11/01/20164.453.812.67ಪ್ಲಾಂಟ್ ಕಮಿಷನಡ್Completed11/19/2017 4:31:21 PM
13 klb151123283AfzalpurInfrastructureWater SupplyGENERALInstallation of WPP plant in Aurad village under JalamrithRWS11/01/2016 4.45 11/1/20164.453.811.52ಪ್ಲಾಂಟ್ ಕಮಿಷನಡ್Completed11/19/2017 4:31:39 PM
14 KLB1513106KalaburagiInstitutionalUniversityGENERALConstruction of Sanitary Landfill pit with Leachate collection tank at Central University, KalaburagiCMC01/03/2016 14.78 01/03/201614.8014.0213.74CompletedCompleted10/28/2017 3:39:27 PM
15 KLB1513109KalaburagiInstitutionalUniversityGENERALDry waste and compost storage unit in Central University, KalaburagiCMC01/03/2016 5.00 01/03/20164.924.713.65CompletedCompleted10/28/2017 3:40:37 PM
16 KLB1513110KalaburagiInstitutionalUniversityGENERALElectrification work at Central University, KalaburagiCMC01/03/2016 5.00 01/03/20163.423.372.54CompletedCompleted11/18/2017 4:27:29 PM
17 KLB1513111KalaburagiInstitutionalUniversityGENERALSinking of Borewell and providing 1HP pumping Machinery at Central University, Kalaburagi CMC01/03/2016 1.51 01/03/20161.511.470.26CompletedCompleted10/28/2017 3:42:18 PM
18 KLB152113028AlandInfrastructureWater SupplyGeneralProvision of RO Plants in Govt. PS School premises of Naroona Village of Aland talukRWS24/09/2015 1.50 18/01/20161.500.990.00ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 4:32:08 PM
19 KLB152113029AlandInfrastructureWater SupplyGeneralProvision of RO Plants in Govt. PS School premises of Duttargaon Village of Aland talukRWS24/09/2015 1.50 18/01/20161.500.990.00ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 4:35:14 PM
20 KLB152113030AlandInfrastructureWater SupplyGeneralProvision of RO Plants in Govt. High School premises of Padasavali Village of Aland talukRWS24/09/2015 1.50 19/11/20151.500.990.00ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 4:36:34 PM
21 KLB152113033AlandInfrastructureWater SupplyGeneralProvision of RO Plants in Govt. High School premises of Khajuri Village of Aland talukRWS24/09/2015 1.50 19/11/20151.500.990.00ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 4:37:28 PM
22 KLB152113034AlandInfrastructureWater SupplyGeneralProvision of RO Plants in Govt. PS School premises of Khajuri Village of Aland talukRWS24/09/2015 1.50 19/11/20151.500.990.00ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 4:37:51 PM
23 KLB152113035AlandInfrastructureWater SupplyGeneralProvision of RO Plants in Govt. High School premises of Babaleshiwar Village of Aland talukRWS24/09/2015 1.50 19/11/20151.500.990.00ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 4:41:00 PM
24 KLB152113036AlandInfrastructureWater SupplyGeneralProvision of RO Plants in Govt. High School premises of Nimbarga Village of Aland talukRWS24/09/2015 1.50 19/11/20151.500.990.00ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 4:41:19 PM
25 KLB152113037AlandInfrastructureWater SupplyGeneralProvision of RO Plants in Govt. High School premises of Yelasangi Village of Aland talukRWS24/09/2015 1.50 19/11/20151.500.990.00ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 4:41:42 PM
26 KLB152113038AlandInfrastructureWater SupplyGeneralProvision of RO Plants in Govt. High School premises of Jawali Village of Aland talukRWS24/09/2015 1.50 19/11/20151.500.990.00ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 4:42:46 PM
27 KLB152113039AlandInfrastructureWater SupplyGeneralProvision of RO Plants in Govt. HPS School premises of Munnalli Village of Aland talukRWS24/09/2015 1.50 19/11/20151.500.990.00ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 4:43:17 PM
28 KLB152113040AlandInfrastructureWater SupplyGeneralProvision of RO Plants in Govt. HPS School premises of Tadakal Village of Aland talukRWS24/09/2015 1.50 19/11/20151.500.990.00ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 4:43:34 PM
29 KLB152113041AlandInfrastructureWater SupplyGeneralProvision of RO Plants in Govt. HPS School premises of Belamagi Village of Aland talukRWS24/09/2015 1.50 19/11/20151.500.990.00ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 4:43:56 PM
30 KLB152123027AlandInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Kadaganchi Village of Aland talukRWS24/09/2015 1.50 19/11/20151.500.990.00ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 4:44:15 PM
31 KLB152123031AlandInstitutionalWater supplyGeneralProvision of RO Plants in Govt. High School premises of Hallisalagar Village of Aland talukRWS24/09/2015 1.50 19/11/20151.500.990.00ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 4:44:38 PM
32 KLB152123094AlandInfrastructureRoads & BridgesGeneralFormation of road from Duttargaon main road to Amareshwar Temple at Duttargaon Village in Aland TalukaPRED09/10/2015 15.00 29/01/201615.0013.3112.00Physically CompletedCompleted12/5/2017 10:34:46 AM
33 KLB152123117AlandInfrastructureRoads & BridgesGeneralCC road in Rudrawadi village in Aland talukPRED07/10/2015 25.00 07/01/201625.0023.6223.62Physically CompletedCompleted12/5/2017 10:37:30 AM
34 KLB153123012ChincholiInfrastructureSanitationGeneralConstruction of Public Tiolet for Women in SC colony of Miriyan village in Chinchol talukPRED05/08/2015 4.50  0.004.451.00ಕೆಲಸ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted 
35 KLB153123157ChincholiInfrastructureRoads & BridgesGeneralConstn of CC road with drian and CD at Chandapur Ashraya colony internal roads Chandapur in Chincholi townKRIDL-225/01/2016 157.13 25/01/2016157.130.00157.13CompletedCompleted10/24/2017 12:42:42 PM
36 KLB153123158ChincholiInfrastructureRoads & BridgesGeneralConstn of CC road with drian and CD from Chincholi SBH bank to infront to Laxmi temple here agashi via Bogappa Master house in Chincholi townKRIDL-225/01/2016 101.46 25/01/2016101.460.00101.46Completed.Completed11/19/2017 1:07:05 PM
37 KLB153123159ChincholiInfrastructureRoads & BridgesGeneralConstn of CC road with drian and footpath Harkood school to Shivakumar Paliyd house Basavanagar Chandapur in Chincholi townKRIDL-225/01/2016 136.82 25/01/2016136.820.00136.82Completed.Completed11/19/2017 1:08:02 PM
38 KLB153123160ChincholiInfrastructureRoads & BridgesGeneralConstn of CC road with drian and CD Chincholi Sri Ram nagar vijaykumar houseto Tukaram chandrampalli house via Prabhu Dandin house in Chincholi townKRIDL-225/01/2016 53.04 25/01/201653.040.0053.05completedCompleted10/24/2017 12:43:23 PM
39 KLB153413253ChincholiInfrastructureRoads & BridgesGeneralFormation of road from Chimmanchod to Basavantpur in Chincholli PRED22/06/2015 50.00 29/02/201649.7045.3143.45Physicaly CompletedCompleted12/5/2017 10:39:12 AM
40 KLB154123001ChittapurInfrastructureRoads & BridgesGeneralFormation of road from Chittapur taluk footpath to bhosga road ( A.P border ) (SH126) Km 58-60 double lane PWD SEDAM03/09/2015 157.20 07/01/2016178.20170.45166.94Work CompletedCompleted11/16/2017 12:23:44 PM
41 KLB154123002ChittapurInfrastructureRoads & BridgesGeneralImprovement of Drains in Dandoti village Chittapur takukPRED03/09/2015 25.80 05/11/201525.8025.3723.60physically completedCompleted12/5/2017 10:41:29 AM
42 KLB154123003ChittapurInfrastructureRoads & BridgesGeneralImprovement on Chittapur Malkhed Road and road over bridge on Kagina river in Malkhed villagePMGSY19/10/2015 49.50 05/11/201549.5046.9346.92Completed Completed9/5/2017 11:56:40 AM
43 KLB154123048ChittapurInfrastructureSanitationGeneralConstruction of Public Tiolet for Women in Hosur village of chittapur talukPRED24/09/2015 4.50 19/11/20154.504.454.40WORK COMPLETEDCompleted11/9/2017 3:23:16 PM
44 KLB154123049ChittapurInfrastructureSanitationGeneralConstruction of Public Tiolet in Herur K village of Chittapur talukPRED24/09/2015 4.50 19/11/20154.504.454.21ಕೆಲಸ ಮುಗಿದಿದೆCompleted11/9/2017 3:23:43 PM
45 KLB154123050ChittapurInfrastructureSanitationGeneralConstruction of Public Tiolet for Women in Banahatti village of chittapur talukPRED24/09/2015 4.50 19/11/20154.504.453.68completedCompleted11/9/2017 3:24:28 PM
46 KLB154123051ChittapurInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Taritanda of Chittapur talukRWS24/09/2015 1.50 18/01/20161.500.990.00ಭೌತಿಕವಾಗಿ ಕೆಲಸ ಮುಗಿದಿದೆCompleted11/19/2017 4:49:32 PM
47 KLB154123053ChittapurInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Bhankur Village of Chittapur talukRWS24/09/2015 1.50 18/01/20161.500.990.00ಭೌತಿಕವಾಗಿ ಕೆಲಸ ಮುಗಿದಿದೆCompleted11/19/2017 4:53:01 PM
48 KLB154123054ChittapurInfrastructureSanitationGeneralConstruction of Public Tiolet for Women in Halakatta village of chittapur talukPRED24/09/2015 4.50 19/11/20154.504.453.50completedCompleted11/9/2017 3:26:34 PM
49 KLB154123055ChittapurInfrastructureSanitationGeneralConstruction of Public Tiolet for Women in Madabool Tanda of chittapur talukPRED24/09/2015 4.50 19/11/20174.504.454.35completedCompleted11/20/2017 11:22:50 AM
50 KLB154123118ChittapurInfrastructureWater supplyGeneralProviding mother drain 530 mts setting champer Areation pound to Kalgi (part-2)RWS03/10/2015 49.11 03/10/201549.1149.0643.90completedCompleted11/19/2017 4:53:48 PM
51 KLB154123156ChittapurInfrastructureRoads & BridgesGeneralConst of road on both side of under bridge in Shampurhalli in Chittapur tqRailways31/12/2015 185.65  0.00185.650.00work completed and fund released to railway dept GuntakalCompleted11/20/2017 1:24:46 PM
52 klb154123287ChittapurInfrastructureWater SupplyGENERALInstallation of WPP plant in Hosur village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.811.14Plant commissionedCompleted11/19/2017 4:54:48 PM
53 klb154123288ChittapurInfrastructureWater SupplyGENERALInstallation of WPP plant in Wacca village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.811.14Plant commissioned Completed11/19/2017 4:55:25 PM
54 klb154123291ChittapurInfrastructureWater SupplyGENERALInstallation of WPP plant in Itaga village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.811.14Plant commissionedCompleted11/19/2017 5:02:20 PM
55 klb154123292ChittapurInfrastructureWater SupplyGENERALInstallation of WPP plant in Devan tegnoor village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.811.14Plant commissionedCompleted11/19/2017 5:02:50 PM
56 KLB154623231ChittapurInfrastructurewater supplyGeneralProviding water supply scheme to PHC centre @ Arnakal village in Chittapur talukaRWS23/12/2016 8.92 23/12/20168.926.246.69ಕೆಲಸ ಮುಗಿದಿದೆCompleted11/19/2017 5:04:06 PM
57 KLB155113018JewargiInfrastructureWater supplyGeneralProviding Chainlink fencing & Electrochlorinator to open well @ Jainapur village in Jewargi talukRWS05/08/2015 4.50 23/11/20154.503.472.58ಕಾಮಗಾರಿ ಪೂರ್ಣಗೊಂಡಿದೆCompleted11/19/2017 5:48:06 PM
58 KLB155113056JewargiInfrastructureWater supplyGeneralProviding Chainlink fencing & Electrochlorinator to open well @ Andola village in Jewargi talukRWS24/09/2015 4.00 23/11/20154.002.932.48ಕೆಲಸ ಮುಗಿದಿದೆCompleted11/19/2017 5:48:37 PM
59 KLB155113057JewargiInfrastructureWater supplyGeneralProviding Chainlink fencing & Electrochlorinator to open well @ Mudabal (B) village in Jewargi talukRWS24/09/2015 4.00 23/11/20154.002.932.13ಕೆಲಸ ಮುಗಿದಿದೆCompleted11/19/2017 5:49:10 PM
60 KLB155113058JewargiInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Haranur Village of Jewargi talukRWS24/09/2015 1.50 19/11/20151.500.990.00ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 5:07:09 PM
61 KLB155113063JewargiInfrastructureSanitationGeneralConstruction of Public Tiolet in Narayanapur village of Jewaragi talukPRED24/09/2015 4.50 19/11/20154.504.453.75ಕೆಲಸ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/9/2017 3:31:49 PM
62 KLB155123013JewargiInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Ganvar Village of Jewargi talukRWS05/08/2015 1.50 19/11/20151.500.990.00ಭೌತಿಕವಾಗಿ ಕೆಲಸ ಮುಗಿದಿದೆCompleted11/19/2017 5:08:02 PM
63 KLB155123015JewargiInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Aurad Village of Jewargi talukRWS05/08/2015 1.50 19/11/20151.500.990.00ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 5:09:00 PM
64 KLB155123016JewargiInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Biral (B) Village of Jewargi talukRWS05/08/2015 1.50 19/11/20151.500.990.00ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 5:09:19 PM
65 KLB155123017JewargiInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Andola Village of Jewargi talukRWS05/08/2015 1.50 19/11/20151.500.990.00ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 5:09:55 PM
66 KLB155123059JewargiInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Haraval Village of Jewargi talukRWS24/09/2015 1.50 19/11/20151.500.990.00ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 5:26:32 PM
67 KLB155123060JewargiInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Gudur S A Village of Jewargi talukRWS24/09/2015 1.50 19/11/20151.500.990.00ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 5:26:54 PM
68 KLB155123062JewargiInfrastructureSanitationGeneralConstruction of Public Toilet in Vastari village of Jewaragi talukPRED24/09/2015 4.50 23/11/20154.504.453.70phy completedCompleted11/27/2017 2:38:29 PM
69 KLB155123210JewargiInfrastructureNemmadi UruGeneralMonitoring and service tax for Electirfication work at ward no 38 and installation of Controlling point in JewargiTMC JEWARGI04/05/2016 2.91 01/03/20172.912.912.91under progressCompleted11/21/2017 11:23:25 AM
70 KLB155413252JewargiInfrastructureRoads & BridgesGeneralFormation of road from Harizan colony to Hana basaveshwar colony temple in Nelogi village Jewargi talukPRED22/06/2015 20.00 05/01/201632.7132.0932.02completed Completed12/5/2017 10:49:43 AM
71 KLB156113077SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt.High School premises of Malakhed village of Sedam talukRWS24/09/2015 1.50 18/01/20161.500.990.00ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 5:29:54 PM
72 KLB156113078SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Kurikunta village of Sedam talukRWS24/09/2015 1.50 18/01/20161.500.990.00ಕೆಲಸ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 5:34:56 PM
73 KLB156113079SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Adaki village of Sedam talukRWS24/09/2015 1.50 23/11/20151.500.990.00ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 5:35:20 PM
74 KLB156113080SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt. High School premises of Ranjol village of Sedam talukRWS24/09/2015 1.50 23/11/20151.500.990.00ಕೆಲಸ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 5:35:44 PM
75 KLB156113082SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Nachawar village of Sedam talukRWS24/09/2015 1.50 19/11/20151.500.990.00ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 5:36:48 PM
76 KLB156113083SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt. High School premises of Buragpalli village of Sedam talukRWS24/09/2015 1.50 23/11/20151.500.990.00ಕೆಲಸ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 5:37:06 PM
77 KLB156113084SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt. High School premises of Batagera (B) village of Sedam talukRWS24/09/2015 1.50 23/11/20151.500.990.00ಕೆಲಸ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 5:37:34 PM
78 KLB156113085SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Sindhanamadu village of Sedam talukRWS24/09/2015 1.50 23/11/20151.500.990.00ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 5:37:55 PM
79 KLB156123072SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt. High School premises of Mudhol village of Sedam talukRWS24/09/2015 1.50 19/11/20151.500.990.00ಕೆಲಸ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 5:38:15 PM
80 KLB156123073SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt. High School premises of Medak village of Sedam talukRWS24/09/2015 1.50 19/11/20151.500.990.00ಕೆಲಸ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 5:38:34 PM
81 KLB156123076SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Beeranalli village of Sedam talukRWS24/09/2015 1.50 19/11/20151.500.990.00ಕೆಲಸ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆCompleted11/19/2017 5:39:40 PM
82 KLB156123134SedamInfrastructureRoads & BridgesGeneralConstn of approach road to Madaranarasapalli from SH 122 (Imadapur cross) Km 0.00 to 2.450 in Sedam talukaPWD SEDAM29/10/2015 92.00 04/01/201681.0080.0679.83Work CompletedCompleted11/16/2017 12:25:07 PM
83 KLB156123135SedamInfrastructureRoads & BridgesGeneralConstn of approach road to Hala hanamanhalli from Sindhanamadu village Km 0.00 to 0.300 in Sedam talukaPWD SEDAM29/10/2015 13.55 04/01/201613.2511.5910.84Work completedCompleted11/16/2017 12:25:33 PM
84 KLB156123136SedamInfrastructureRoads & BridgesGeneralConstn of approach road to Batagera (B) from SH10 km 0.00 to 1.60 in Sedam talukaPWD SEDAM09/01/2016 169.60 09/01/2016169.60162.08161.21Work completedCompleted11/16/2017 12:26:17 PM
85 KLB156413254SedamInfrastructureRoads & BridgesGeneralConstruction of approach road to Madhwar from SH-122 Km 0.00 to 0.410 in Sedam TalukaPWD SEDAM11/08/2015 25.00 05/01/201624.0023.6920.92Work completedCompleted11/16/2017 12:26:50 PM
86 KLB156423255SedamInfrastructureRoads & BridgesGeneralFormation of CC road & drain in Rajol village in Sedam talukKRIDL-216/11/2015 25.00 03/05/201625.0024.5025.00Completed. Completed12/8/2017 5:44:00 PM
87 KLB157113065KalaburagiInfrastructureSanitationGeneralConstruction of Public Tiolet in Kadani village of Kalaburagi talukPRED24/09/2015 4.50 23/11/20154.504.454.07compltedCompleted11/9/2017 4:00:58 PM
88 KLB157113086KalaburagiInfrastructureRoads & BridgesGeneralConstruction of RCC Drain & NP3 pipe line drain from bhimalli house to fort @ ward no. 33 KalaburagiNK22/07/2015 11.50 22/07/201511.500.004.18work Completed & handed over (RCC drain work completed no need of NP3 pipe decks slab hence drop)Completed9/11/2017 6:03:44 PM
89 KLB157113087KalaburagiInfrastructureRoads & BridgesGeneralConstruction of RCC Drain from Chowdeshwar school Jange brothers & Shivand swamy house to main road @ ward no. 34 kalaburagiNK22/07/2015 20.89 22/07/201520.890.0013.88Work CompletedCompleted8/8/2017 12:48:53 PM
90 KLB157113088KalaburagiInfrastructureRoads & BridgesGeneralProviding 12m high mast light @ ward no. 33 kalaburagiNK22/07/2015 2.90 22/07/20152.900.002.88work Completed & handed overCompleted10/7/2017 10:16:55 AM
91 KLB157113089KalaburagiInfrastructureRoads & BridgesGeneralProviding Drilling of borwell @ ward no. 34 KalaburagiNK22/07/2015 1.28 22/07/20151.280.000.00work Completed & handed overCompleted10/7/2017 10:17:46 AM
92 KLB157113090KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Chigarahalli Yedrami main road to Gogihal village PMGSY14/12/2015 119.79 14/12/2015119.79111.90110.74CompletedCompleted11/3/2017 6:22:39 PM
93 KLB157113168KalaburagiInstitutionalPark GeneralConstruction of shops at Public Exhibition Ground Kotnoor D Park KalaburagiNK28/01/2015 40.80 22/08/201540.800.0042.36work completedCompleted8/8/2017 12:55:45 PM
94 KLB157113173KalaburagiInstitutionalSportsGeneralInstallation of Indoor synthetic Tennis court 3 no. @ CP Stadium KalaburagiNK20/06/2015 32.23 20/06/201532.230.0032.19work CompletedCompleted10/7/2017 12:07:57 PM
95 KLB157113174KalaburagiInstitutionalSportsGeneralInstallation of 1 no. Synthetic Tennis court @ Police Ground KalaburagiNK20/06/2015 13.45 20/06/201513.450.0012.07work completedCompleted9/11/2017 6:08:09 PM
96 KLB157113175KalaburagiInstitutionalSportsGeneralConstruction of clay tennis court @ block 1 Police Ground KalaburagiNK20/06/2015 3.94 20/06/20153.940.003.93work CompletedCompleted9/11/2017 6:09:19 PM
97 KLB157113176KalaburagiInstitutionalSportsGeneralConstruction of clay tennis court @ block 2 Police Ground KalaburagiNK20/06/2015 3.94 20/06/20153.940.003.93work CompletedCompleted9/11/2017 6:10:02 PM
98 KLB157113177KalaburagiInstitutionalSportsGeneralInstallation of Indoor synthetic Badminton court 6 no. @ CP Stadium KalaburagiNK20/06/2015 41.24 20/06/201541.240.0042.10work CompletedCompleted8/8/2017 1:09:12 PM
99 KLB157113178KalaburagiInstitutionalSportsGeneralIndoor renovation work @ CP Stadium Kalaburagi [Badminton court]NK22/07/2015 9.85 30/03/20159.850.008.25work CompletedCompleted8/8/2017 1:10:54 PM
100 KLB157113179KalaburagiInstitutionalSportsGeneralInstallation of Indoor synthetic Badminton court 2 no. @ Govt officers family club KalaburagiNK22/08/2015 7.29 22/08/20157.290.007.26work CompletedCompleted8/8/2017 1:12:03 PM
101 KLB157113180KalaburagiInstitutionalSportsGeneralConstruction of ELSR 50KL capacity at CP Stadium KalaburagiNK16/09/2015 10.82 16/09/201510.830.008.76Work completedCompleted8/8/2017 1:13:26 PM
102 KLB157113181KalaburagiInstitutionalSportsGeneralProviding fencing to hand ball court @ Chandrashekhar patil stadium KalaburagiNK24/11/2015 9.15 24/11/20159.150.0011.63work completedCompleted8/8/2017 1:15:05 PM
103 KLB157113182KalaburagiInstitutionalSportsGeneralConstruction of 2 Hand ball court benches & lightening poles @ Chandrashekhar patil Stadium KalaburagiNK24/11/2015 23.25 24/11/201523.250.0023.17Work completed Completed10/9/2017 3:49:00 PM
104 KLB157113183KalaburagiInstitutionalSportsGeneralConstruction of Kabaddi court for 2 unit blocks @ CP Stadium KalaburagiNK22/07/2015 4.66 22/07/20154.660.002.07work completedCompleted10/7/2017 10:25:29 AM
105 KLB157113184KalaburagiInstitutionalSportsGeneralConstruction of Kho Kho court @ CP Stadium KalaburagiNK22/07/2015 2.47 22/07/20152.470.003.49work completedCompleted10/7/2017 10:24:57 AM
106 KLB157113185KalaburagiInstitutionalSportsGeneralProviding 20 mt High masts light 3 no. @ CP Stadium KalaburagiNK22/07/2015 16.20 22/07/201516.200.0012.94Work completedCompleted10/9/2017 3:53:44 PM
107 KLB157113186KalaburagiInstitutionalSportsGeneralProviding & Installation of 125 KVA Three Phase Generator with AMF control panel at CP Stadium, KalaburagiNK30/09/2015 9.72 30/09/20159.720.008.14work completedCompleted10/7/2017 12:38:15 PM
108 KLB157113191KalaburagiInstitutionalSportsGeneralWater proofing of Gym Building of Main Stadium with Primer Coat and Geofabric and Coats of BrushbondNK08/08/2016 1.44  0.000.0018.08Not necessary, already done it comes under work code KLB157113196 Completed10/12/2017 2:38:48 PM
109 KLB157113192KalaburagiInstitutionalSportsGeneralWater Proofing of of Main Stadium Terrace with Primer Coat, Geofabric and Nitoproof 600NK08/08/2016 6.88  0.000.0018.08Not necessary work already done it comes under work code is KLB157113196Completed8/9/2017 5:07:42 PM
110 KLB157113193KalaburagiInstitutionalSportsGeneralWater Proofing of Sports Hostel Terrace with with Primer Coat and Geofabric and Coats of Brush BondNK08/08/2016 1.10  0.000.0018.08Not necessary work already done it comes under work code is KLB157113196Completed8/9/2017 5:08:06 PM
111 KLB157113195KalaburagiInstitutionalSportsGeneralWater Proofing of Indoor Stadium Chajja Primer Coat and Geofabric and Coats of BrushbondNK08/08/2016 0.72  0.000.0018.08Not necessary work already done it comes under work code is KLB157113196Completed8/9/2017 5:08:57 PM
112 KLB157113196KalaburagiInstitutionalSportsGeneralProviding and laying water proofing to terrace and swimming pool and Chejja at CP stadium KalaburagiNK16/08/2016 18.08 16/08/201618.080.006.46Work completedCompleted10/7/2017 6:07:28 PM
113 KLB157113219KalaburagiInstitutionalUniversityGeneralEstimate for Light Equipments, truss civil and Electrical works for Ambedkar Auditorium at Gulbarga University, KalaburagiNK02/11/2015 36.50 02/11/201536.500.0034.54work completed & handed overCompleted9/13/2017 1:18:05 PM
114 KLB157113220KalaburagiInstitutionalUniversityGeneralAdditional civil works at Ambedkar Auditorium at Gulbarga University, KalaburagiNK23/07/2016 3.82 23/07/20163.820.001.52Work completedCompleted10/7/2017 5:24:43 PM
115 KLB157113221KalaburagiInstitutionalTourismGeneralDevelopment of Deval Gangapur village as Tourism CentrePRED14/10/2015 100.00 14/10/2015100.0083.8668.00Work Completed Final Submitted Final Bill Amount to be releaseCompleted10/11/2017 8:36:05 PM
116 KLB157113222KalaburagiInfrastructureTourismGeneralStage Lighting System Up gradation and Provision of Special effects in S.N Pandit Auditorium Dist Kalaburagi NK25/01/2016 12.33 25/01/201612.330.0012.27Work completedCompleted8/8/2017 1:52:22 PM
117 KLB157113223KalaburagiInfrastructureTourismGeneralSound System Up gradation and Provision of Special effects in S.N Pandit Auditorium Dist KalaburagiNK25/01/2016 9.35 25/01/20169.350.009.30Work completedCompleted8/8/2017 1:53:23 PM
118 KLB157113224KalaburagiInstitutionalInnovativeGeneralEstablishment of small nursery at Chandrampalli Horticulture farm for Multiplication of improved varieties and hybrids of horticulture cropsNK04/08/2015 25.61 23/11/201525.610.007.39Work completedCompleted10/7/2017 12:54:25 PM
119 KLB157113226KalaburagiInstitutionalInnovativeGeneralEstablishment of small nursery at Kotnoor (D), Seed farm, KalaburagiNK04/08/2015 21.99 23/11/201525.390.007.40 Work completed & handed overCompleted9/20/2017 12:51:57 PM
120 KLB157113244KalaburagiInstitutionalSocialGeneralProviding and installing of Air Conditioner and Air Cooler at High Court KalaburagiNK13/01/2016 1.07 13/01/20161.070.001.06Work completedCompleted10/7/2017 6:23:57 PM
121 KLB157113245KalaburagiInstitutionalTraining CenterGeneralConstruction of first floor with gal volume sheet roofing at HKRDB training & evaluation center in KalaburagiNK22/04/2016 17.09 22/04/201617.090.000.00work completedCompleted8/9/2017 5:12:17 PM
122 KLB157123005KalaburagiInfrastructureRoads & BridgesGeneralFormation of BT road from old jewargi road to Udanoor village via Vargis appartment ring road in ward no 55 of KlaburagiPWD KLB21/08/2015 47.80 16/09/201547.8046.6345.97Physically completed. Final report received. Final bill paid.Completed11/19/2017 8:22:41 PM
123 KLB157123006KalaburagiInfrastructureRoads & BridgesGeneralRoad from Hiranagar colony road in Hirapur village , KalaburagiPMGSY08/09/2015 29.90 28/12/201525.0023.9920.00completedCompleted8/8/2017 4:58:19 PM
124 KLB157123010KalaburagiInfrastructureRoads & BridgesGeneralImprovements of road in Bapugowda Darshanpur layout and Sardar Vallabhai Patel layout in Kalaburagi PWD KLB03/09/2015 114.20 29/10/2015139.28143.21107.46Physically completed. Final bill Submitted to Accounts.Completed11/19/2017 8:23:38 PM
125 KLB157123066KalaburagiInfrastructureSanitationGeneralConstruction of Public Tiolet in Harasur village of Kalaburagi talukPRED24/09/2015 4.50  0.004.454.35completedCompleted11/4/2017 10:57:06 AM
126 KLB157123067KalaburagiInfrastructureSanitationGeneralConstruction of Public Tiolet in Hagargundagi village of Kalaburagi talukPRED24/09/2015 4.50 23/11/20154.504.454.28completedCompleted11/9/2017 4:03:39 PM
127 KLB157123068KalaburagiInfrastructureSanitationGeneralConstruction of Public Tiolet in Mahagaon Cross of Kalaburagi talukPRED24/09/2015 4.50 23/11/20154.504.454.07completedCompleted11/9/2017 4:05:48 PM
128 KLB157123069KalaburagiInfrastructureSanitationGeneralConstruction of Public Tiolet in Melakunda K village of Kalaburagi talukPRED24/09/2015 4.50  0.000.002.00PHY COMPLETEDCompleted11/4/2017 10:57:53 AM
129 KLB157123070KalaburagiInfrastructureSanitationGeneralConstruction of Public Tiolet for women in Hagaraga village near Pojar colony of Kalaburagi talukPRED24/09/2015 4.50 23/11/20154.504.454.13WORK COMPLETED FINAL BILL SUBMITTED ON 17.07.2017Completed11/9/2017 4:08:25 PM
130 KLB157123091KalaburagiInfrastructureRoads & BridgesGeneralAmbalga Thanda approach road from Gulbarga Basavakalyan road PMGSY08/09/2015 62.40 19/10/201559.6052.7351.33completedCompleted11/3/2017 6:04:12 PM
131 KLB157123095KalaburagiInfrastructureRoads & BridgesGeneralFormation of raod from Melakunda (B) village to Bhairamadagi in Kalaburagi talukPRED09/10/2015 20.00 18/01/201620.0016.1813.09Physically Completed Completed12/5/2017 10:42:23 AM
132 KLB157123097KalaburagiInfrastructureRoads & BridgesGeneralFormation of BT road from Hirapur cross ring road (Dr Ambedkar circle) to Railway gate in KalaburagiCMC27/05/2016 57.80 13/07/201657.8054.0457.04CompletedCompleted10/28/2017 3:43:17 PM
133 KLB157123098KalaburagiInfrastructureRoads & BridgesGeneralFormation of BT road fron Tahsil office to Milan Chowk in KalaburagiCMC18/03/2016 24.90 18/03/201624.9021.5419.56CompletedCompleted10/28/2017 3:43:51 PM
134 KLB157123101KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no1 (Km 0.00 to 0.395)CMC25/01/2016 39.06 04/02/201639.0633.3531.04CompletedCompleted10/8/2017 5:22:33 PM
135 KLB157123102KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no2 (Km 0.00 to 0.240)CMC25/01/2016 26.10 04/02/201626.1022.2321.31CompletedCompleted10/8/2017 5:23:11 PM
136 KLB157123103KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no3 (Km 0.00 to 0.205)CMC25/01/2016 21.60 04/02/201621.6019.4520.17CompletedCompleted10/8/2017 5:23:31 PM
137 KLB157123106KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no6 (Km 0.00 to 0.260)CMC25/01/2016 37.17 04/02/201637.1733.5431.24CompletedCompleted10/8/2017 5:24:35 PM
138 KLB157123107KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no7 (Km 0.00 to 0.095)CMC25/01/2016 9.90 02/02/20169.908.469.11CompletedCompleted10/8/2017 5:24:54 PM
139 KLB157123108KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no8 (Km 0.00 to 0.045)CMC25/01/2016 4.77 04/02/20164.774.614.52CompletedCompleted10/8/2017 5:25:19 PM
140 KLB157123109KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no9 (Km 0.00 to 0.045)CMC25/01/2016 4.77 04/02/20164.774.614.62CompletedCompleted10/28/2017 3:44:42 PM
141 KLB157123110KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no10 (Km 0.00 to 0.048)CMC25/01/2016 5.07 04/02/20165.074.914.77CompletedCompleted11/24/2017 4:23:02 PM
142 KLB157123111KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no11 (Km 0.00 to 0.047)CMC25/01/2016 4.97 04/02/20164.974.524.31CompletedCompleted10/28/2017 3:45:57 PM
143 KLB157123112KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no12 (Km 0.00 to 0.180)CMC25/01/2016 18.13 04/02/201618.1316.0415.97CompletedCompleted10/8/2017 5:26:39 PM
144 KLB157123113KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no13 (Km 0.00 to 0.035)CMC25/01/2016 3.68 04/02/20163.683.373.20CompletedCompleted10/8/2017 5:26:59 PM
145 KLB157123114KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no14 (Km 0.00 to 0.180)CMC25/01/2016 18.13 04/02/201618.1316.0416.94CompletedCompleted10/8/2017 5:27:36 PM
146 KLB157123115KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no15 (Km 0.00 to 0.275)CMC25/01/2016 28.01 04/02/201628.0123.9022.47CompletedCompleted10/28/2017 3:46:32 PM
147 KLB157123116KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no16 (Km 0.00 to 0.140)CMC25/01/2016 14.95 04/02/201614.9513.1613.40CompletedCompleted10/8/2017 5:28:48 PM
148 KLB157123119KalaburagiInfrastructureSanitationGeneralConstruction Toilets in 2 places at Channaveer colony in Kalaburagi city [8 toilets, 2 bath room, 2 basin with miror, 1 washing plantform with fencing, own borewell connection, overhead tank, electrical connection, sump, pit, pump]NK09/10/2015 20.00 14/12/201520.000.002.001 work completed at Corporation vehicle parking premises, 1 completed at CP StadiumCompleted8/9/2017 5:16:29 PM
149 KLB157123120KalaburagiInfrastructureSanitationGeneralConstruction Toilets in 2 places at Rajiv Gandhi Nagar in Kalaburagi city [8 toilets, 2 bath room, 2 basin with miror, 1 washing plantform with fencing, own borewell connection, overhead tank, electrical connection, sump, pit, pump]NK09/10/2015 20.00 14/12/201520.000.002.003) 1 completed at CP Stadium 4) 1 completed at CP Stadium, due to non availability of site at given colony & as per oral direction of RC sirCompleted8/9/2017 5:18:10 PM
150 KLB157123122KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CD &CC road from Annappagol house to chandrakant mechanic house & Construction of CC drain & road from annappagol house to shanranappa poojari house via taj sultapur main roadCMC09/12/2015 12.00 02/11/201612.009.879.59CompletedCompleted10/7/2017 6:51:13 PM
151 KLB157123123KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CC drain & road from Jagannath kallshetty house sulbarpur main road at Channaveer colony kalaburagi cityCMC09/12/2015 12.00 02/11/201612.009.799.42CompletedCompleted11/9/2017 4:09:56 PM
152 KLB157123124KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CC drain & road from Ramashetty hadapad house sultapur shivu limbal or shantayya sirgapur house in Chnnaveer colony kalaburagi cityCMC09/12/2015 12.00 02/11/201612.009.6810.02CompletedCompleted10/7/2017 6:52:00 PM
153 KLB157123125KalaburagiInfrastructureRoads & BridgesGeneralConstruction CC drain & road from Taj sultanpur maind road to nakul kumbar house uupto Shivaray busatty revur house in channveer colony in kalaburagi cityCMC09/12/2015 12.00 02/11/201612.009.609.36CompletedCompleted10/7/2017 6:52:20 PM
154 KLB157123126KalaburagiInfrastructureRoads & BridgesGeneralConstruction CC drain & road from Moonlight school to Mahadevappa badal house in channaveer colony in kalaburagiCMC09/12/2015 12.00 02/11/201612.009.609.05CompletedCompleted11/24/2017 4:22:26 PM
155 KLB157123127KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CC road from Nandu adaki house to Sultanpur road in Channaveer nagar Kalaburagi cityCMC09/12/2015 12.00 02/11/201612.009.629.60CompletedCompleted10/7/2017 6:52:59 PM
156 KLB157123128KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CC road from Arun talati house to nagaraj reddy hous & Jai mata Finance in Chnnaveer nagar Kalaburagi cityCMC09/12/2015 12.00 02/11/201612.009.739.12CompletedCompleted10/7/2017 6:53:27 PM
157 KLB157123129KalaburagiInfrastructureRoads & BridgesGeneralConstruction CC drain & road from Mahadev temple to Ommantai house in Channaveer nagar Kalaburagi cityCMC09/12/2015 12.00 02/11/201612.009.619.57CompletedCompleted10/7/2017 6:54:03 PM
158 KLB157123131KalaburagiInfrastructureRoads & BridgesGeneralConstn of CC drain from Gunj Main road to M.K Transport office at Gandhinagar, KalaburagiPMGSY21/10/2015 35.00 23/12/201535.0031.8128.00completedCompleted11/3/2017 6:17:59 PM
159 KLB157123132KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road surrounding Amba Bhavani Temple at Gandhinagar, KalaburagiPMGSY21/10/2015 35.00 23/12/201535.0034.5333.26completedCompleted11/3/2017 6:20:43 PM
160 KLB157123133KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from M.K. Transport office to Gunj road in KalaburagiPMGSY21/10/2015 30.00 23/12/201530.0027.2727.26completedCompleted9/5/2017 12:02:21 PM
161 KLB157123137KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Jange brother house to raghavendra colony CC road ( Jange Borthers Widen portion)CMC24/11/2015 50.00 28/01/201645.2538.5838.82CompletedCompleted10/7/2017 1:27:38 PM
162 KLB157123138KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Manikeshwari temple to shahabazar Naka in Kalaburagi cityCMC03/01/2016 59.00 04/01/201659.0048.8427.05CompletedCompleted10/7/2017 1:28:14 PM
163 KLB157123139KalaburagiInfrastructureRoads & BridgesGeneralImprovement of BT road Sedam road to Veerashaiva Kalyan Mantap Via Laxmi Nagar and Om nagar in Kalaburagi City.CMC03/01/2016 54.50 04/01/201654.5048.8443.65CompletedCompleted10/7/2017 1:28:30 PM
164 KLB157123140KalaburagiInfrastructureRoads & BridgesGeneralImprovement of CC road form Opp. Fire Station to Chowdeshwari School in Kalaburagi City.CMC03/01/2016 52.00 04/01/201652.0042.8532.77CompletedCompleted10/7/2017 1:28:49 PM
165 KLB157123141KalaburagiInfrastructureRoads & BridgesGeneralConstrucation of CC road from Kalaburagi – Jewargi Main road behind Muktha Theatare in Kalaburagi City.CMC03/01/2016 38.00 04/01/201638.0023.0027.37CompletedCompleted10/28/2017 3:47:50 PM
166 KLB157123143KalaburagiInfrastructureRoads & BridgesGeneralConstrucation of Strom Water Drain Opp. ST. Joseph School in Kalaburagi City.CMC29/02/2016 29.00 05/01/201629.0026.3523.07CompletedCompleted10/7/2017 1:29:31 PM
167 KLB157123144KalaburagiInfrastructureRoads & BridgesGeneralImpts of BT road from PDA Engineering college to Vijay vidyalaya school in Kalaburagi cityCMC02/01/2016 32.00 04/01/201632.0026.0826.95CompletedCompleted10/7/2017 1:30:08 PM
168 KLB157123145KalaburagiInfrastructureRoads & BridgesGeneralConstn of CC road from Vijay Vidyalaya school to Lahoti Pertol pump in Kalaburagi cityCMC02/01/2016 93.50 04/01/201693.5074.5247.71CompletedCompleted10/7/2017 1:31:58 PM
169 KLB157123146KalaburagiInfrastructureRoads & BridgesGeneralImpts of BT road from Siddi Pasha darga to sedam road via old ZP meeting hall in Kalaburgi cityCMC02/01/2016 13.00 04/01/201613.0010.8510.85CompletedCompleted10/7/2017 1:32:33 PM
170 KLB157123147KalaburagiInfrastructureRoads & BridgesGeneralImpts of BT road from Govt Hospital circle to Darga road in Kalaburagi cityCMC02/01/2016 35.50 04/01/201635.5028.9317.79CompletedCompleted10/28/2017 3:48:30 PM
171 KLB157123148KalaburagiInfrastructureRoads & BridgesGeneralImpts of Bt road from Darga road to MRMC college via Bharath Nagar Thanda in Kalaburagi cityCMC02/01/2016 30.50 04/01/201630.5024.8719.37CompletedCompleted10/28/2017 3:49:28 PM
172 KLB157123149KalaburagiInfrastructureRoads & BridgesGeneralFormation of road from Sedam( Mahindra showroom) to Luqman college in Kalaburagi cityCMC02/01/2016 46.50 04/01/201646.5027.7136.68CompletedCompleted10/28/2017 3:50:22 PM
173 KLB157123150KalaburagiInfrastructureRoads & BridgesGeneralConstn of CC road from SVP circle to railway station (one way) in Kalaburagi cityCMC02/01/2016 52.00 04/01/201652.0042.896.04CompletedCompleted10/7/2017 1:34:21 PM
174 KLB157123152KalaburagiInfrastructureRoads & BridgesGeneralImpt of road from Manikeshwari temple to Mallikarjun temple Kailash nagar in Kalaburagi cityCMC02/01/2016 12.50 04/01/201612.500.0010.07CompletedCompleted10/28/2017 3:53:16 PM
175 KLB157123154KalaburagiInfrastructureRoads & BridgesGeneralImpt of road from Kanni market to Ashok nagar (OHT) via Shanti nagar in Kalaburagi cityCMC02/01/2016 38.00 04/01/201638.0031.0335.04CompletedCompleted10/7/2017 1:35:27 PM
176 KLB157123155KalaburagiInfrastructureRoads & BridgesGeneralImpt of road from Jaitheeerth kalyan mantap to Navldagi layout (udnoor road) in Kalaburagi cityCMC02/01/2016 34.50 04/01/201634.5027.1618.55CompletedCompleted9/6/2017 3:50:47 PM
177 KLB157123161KalaburagiInfrastructureRoads & BridgesGeneralImpt of Kalaburagi ring road (NH218) to Kusnoor via Azadpur SH10 and Buddha Vihar Km 0.00 to 9.00 in KalaburagiPWD KLB22/08/2015 48.00 22/08/201548.0047.8947.52Completed. Final report recived. Final bill Paid.Completed11/19/2017 8:36:33 PM
178 KLB157123217KalaburagiInstitutionalHealthGeneralRepair work of Mammography room at District health KalaburagiNK16/08/2015 1.14 16/08/20151.140.000.81Work CompletedCompleted8/9/2017 5:21:24 PM
179 klb157123301KalaburagiInfrastructureWater SupplyGENERALInstallation of WPP plant in Harknchi village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00plant commissionedCompleted11/19/2017 5:57:06 PM
180 klb157123302KalaburagiInfrastructureWater SupplyGENERALInstallation of WPP plant in Allugud village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.00Plant commissionedCompleted11/19/2017 5:57:34 PM
181 KLB157123322ChittapurInfrastructureWater SupplyGENERALDrain Construction of Kalagi(Part-3)RWS03/10/2015 48.80 03/10/201548.8048.7121.04completedCompleted11/19/2017 6:02:11 PM
182 KLB157123323ChittapurInfrastructureWater SupplyGENERALDrain Pipeline at Kalagi (Part-4)RWS03/10/2015 44.95 03/10/201544.9543.3738.89Physically completed(Court Case)Completed11/19/2017 6:02:45 PM
183 KLB157123324ChittapurInfrastructureWater SupplyGENERALDrain Construction at Kalagi (Part-5)RWS03/10/2015 36.55 03/10/201536.5534.5230.11completedCompleted11/19/2017 6:03:26 PM
184 KLB157313262KalaburagiInstitutionalHostelGeneralEquipments to hostel (manual)HKRDB  5.15 30/12/20155.150.000.00completedCompleted 
185 KLB157313263KalaburagiInstitutionalHostelGeneralfurniture to hostel (ind-65)HKRDB  14.47 24/11/201514.470.0013.97completedCompleted11/7/2017 1:40:13 PM
186 KLB157313269KalaburagiInstitutionalHealthGeneralConstn of maternity hall at PHC Rahmat nagar (Balance Work) in Kalaburagi Tq.PWD KLB07/05/2015 15.00 08/10/201515.0014.7913.38physically completed.Completed11/19/2017 8:28:17 PM
187 KLB157313270KalaburagiInfrastructureRoads & BridgesGeneralConstrication of CC road and CC drain from Hagarga main road nor complex to rahmat nagar existing road via prince function hall including internal road in gulshan-e-arafat colony in kalaburagi.PWD KLB07/05/2015 195.00 08/10/2015164.92170.86131.92physically completedCompleted11/19/2017 8:29:34 PM
188 KLB157313271KalaburagiInfrastructureRoads & BridgesGeneralConstrication of RCC slabs over existing CC drain from Patel complex to Ittehad Chowk in firdous colony and abubakar colony in ward No. 13 kalaburagi.PWD KLB07/05/2015 25.00 08/10/201525.0024.1920.00Physically complted final report received.Completed11/19/2017 8:30:36 PM
189 KLB157313272KalaburagiInfrastructureRoads & BridgesGeneralConstrication of Storm water drain from Masjid-e-Asra to Join Azadpur road including CD in Ahmed nagar Colony in W.No.13 Kalaburagi Tq.PWD KLB07/05/2015 20.00 08/10/201520.0016.4515.80Physically complted final report received.Completed11/19/2017 8:31:14 PM
190 KLB157313273KalaburagiInfrastructureRoads & BridgesGeneralConstrication of Storm water drain from Dr.Tayyab House to join azadpur road and CD via Tahar ali and Kazim baig house in W.No.13 Kalaburagi Tq.PWD KLB07/05/2015 20.00 08/10/201520.0016.4514.43 completedCompleted11/19/2017 8:32:03 PM
191 KLB157313274KalaburagiInfrastructureRoads & BridgesGeneralConstruction of RCC Slabs for road crossing in yadulla colony Kalaburagi Tq.PMGSY07/05/2015 10.00 20/07/201510.008.877.75completedCompleted9/20/2017 12:36:05 PM
192 KLB157323259KalaburagiInstitutionalHostelGeneralSupply of Furnitures, cots R.O's atc to post metric Minority Girls Hostel Shaik Roza Kalaburagi Tq.HKRDB07/05/2015 15.00  0.000.000.00completedCompleted 
193 KLB157323260KalaburagiInstitutionalHostelGeneralSupply of Furnitures, cots R.O's atc to pre metric Minority Girls Hostel Filter bed Area Kalaburagi Tq. HKRDB07/05/2015 15.00  0.000.000.00completedCompleted 
194 KLB157323261KalaburagiInstitutionalschoolGeneralProcurement of Music room for hostel in Kalaburagi(manual tender)HKRDB  4.84 24/11/20154.840.002.72completedCompleted 
195 KLB157323275KalaburagiInfrastructureRoads & BridgesGeneralConstriction of CC road and CC Drain in Yadulla colony Kalaburagi Tq.PMGSY07/05/2015 50.00 16/10/201549.6044.9442.37completedCompleted11/3/2017 6:06:13 PM
196 KLB157323276KalaburagiInfrastructureRoads & BridgesGeneralConstriction of CC road and CC drain from hagarga main road [SH-149] gouse saw mill cross to MK nagar road via naseeriya masjid including internal roads in Zam Colony Kalaburagi cityPMGSY07/05/2015 198.00 14/12/2015183.52171.36194.40completedCompleted10/24/2017 12:40:46 PM
197 KLB157323277KalaburagiInfrastructureRoads & BridgesGeneralImprovements and Asphalting to road and constriction of CC drain from sedam road (SH-10) to Sri. A.B Vajpayee chowk Adarsh nagar colony Kalaburagi Tq.PMGSY07/05/2015 75.00 14/12/201572.8167.8467.84CompletedCompleted11/3/2017 6:09:53 PM
198 KLB157413246KalaburagiInstitutionalCollegeGeneralConstruction of Additional room for PU Women College at Kamalapur Kalaburagi TalukPWD KLB 21/10/2015 25.00 16/02/201625.0024.2123.07 Final report received, Completed11/19/2017 8:37:29 PM
199 KLB157413247KalaburagiInstitutionalHealthGeneralConstruction of Medical Officers Quarters at Mahagaon PHC KalaburagiPWD KLB21/10/2015 30.00 16/02/201629.9628.2720.29Work completed Final bill awaited.Completed11/19/2017 8:34:08 PM
200 KLB157423256KalaburagiInfrastructureRoads & BridgesGeneralProviding CC Road from Khaja Master House to Rehmanshet Plot at Ward No 20 in MSK Mill Area Kalaburagi cityPRED18/01/2016 10.00 30/08/201610.009.729.67completedCompleted12/9/2017 11:57:04 AM
201 KLB157613237KalaburagiInstitutionalSchoolGeneralProviding & Installing 100 KVA generator at Kendriaya vidyalaya school KalaburagiNK07/08/2015 8.80 07/08/20158.800.007.36Work completedCompleted10/7/2017 11:04:33 AM
202 KLB157613238KalaburagiInstitutionalSchoolGeneralConstruction of Children play ground and equipments at Kendriya vidyalaya School kalaburagiNK07/08/2015 5.58 07/08/20155.580.005.58WORK completedCompleted10/7/2017 11:03:57 AM
203 KLB157613239KalaburagiInstitutionalSchoolGeneralProviding Water Purifier to Kendriaya vidyalaya KalaburagiNK30/09/2015 6.52 30/09/20156.520.007.05WORK completedCompleted8/8/2017 3:32:04 PM
204 KLB157613240KalaburagiInstitutionalSchoolGeneralConstruction of Headroom at Kendriya vidyalaya school KalaburagiNK30/09/2015 0.45 30/09/20150.450.000.90work completedCompleted8/8/2017 3:33:27 PM
205 KLB157613241ChincholiInstitutionalSchoolGeneralConstn of first grade degree college at ChincholiKRIDL-206/01/2016 149.20 06/01/2016149.200.00140.00completedCompleted10/24/2017 12:44:22 PM
206 KLB157623229KalaburagiInfrastructurewater supplyGeneralExtra provision of Plat form and pump at Amarja Dam in NimbargaRWS05/02/2016 21.82 05/02/201621.820.0013.09ಸದರಿ ಕಾಮಗಾರಿ ಪೂರ್ಣಗೊಂಡಿದ್ದು, ಉಳಿತಾಯ ಮೊತ್ತದಲ್ಲಿ ಬದಲಿ ಕಾಮಗಾರಿ ತೆಗೆದುಕೊಳ್ಳಲು ಮಾನ್ಯ ಮುಖ್ಯ ಕಾರ್ಯನಿವರ್ಾಹಕ ಅಧಿಕಾರಿಗಳು ಜಿಲ್ಲಾ ಪಂಚಾಯತ ಕಲಬುರಗಿರವರ ಸೂಚನೆ ಮೇರೆಗೆ ಪ್ರಸ್ತಾವನೆ ಸಲ್ಲಿಸಲಾಗಿರುತ್ತದೆ.Completed11/20/2017 11:16:37 AM
207 KLB157623236KalaburagiInstitutionalSchoolGeneralProviding & Installing PA system at Kendriya Vidyalaya school KalaburagiNK07/08/2015 2.82 07/08/20152.820.002.10work completedCompleted10/7/2017 11:03:30 AM
208 KLB177123027KalaburagiInfrastructureWater SupplyGENERALProviding RO Plant in Govt H.P School @ Ranjol Village in sedam TalukaRWS11/01/2016 1.50 23/11/20151.500.990.00 Completed11/20/2017 11:25:44 AM
         4827.17 4571.713313.333823.63